Cargando…
The operational experience and performance of the ATLAS SCT during Run-2 and LS2, and the first impression from Run3 operations.
The performance of ATLAS SemiConductor Tracker (SCT) in Run-2 at Large Hadron Collider (LHC) has been reviewed during the current long shutdown. The LHC successfully completed its Run-2 operation (2015-2018) with a total integrated delivered luminosity of 156 fb−1 at the centre-of-mass pp collision...
Autores principales: | ATLAS SCT Collaboration, Guida, Alessandro |
---|---|
Lenguaje: | eng |
Publicado: |
2023
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2875828 |
Ejemplares similares
-
The operational experience and performance of the SCT during Run-2 and LS2, and the first impression from Run3 operations
por: Borecka-Bielska, Hanna Maria
Publicado: (2022) -
The performance and operational experience of ATLAS Semiconductor Tracker in Run-2 at LHC
por: Grancagnolo, Sergio, et al.
Publicado: (2021) -
The performance and operational experience of ATLAS SemiConductor Tracker in Run-2 at LHC
por: Grancagnolo, Sergio, et al.
Publicado: (2021) -
The operational experience, challenges and performance of the ATLAS Semiconductor Tracker during LHC Run-2 and SCT operation prospect for Run-3
por: Schopf, Elisabeth
Publicado: (2022) -
The operational experience, challenges and performance of the ATLAS Semiconductor Tracker during LHC Run-2 and SCT operation prospect for Run-3
por: Schopf, Elisabeth
Publicado: (2022)