Cargando…
Operation and performance of the ATLAS Semi-Conductor Tracker
As reported in the previous VERTEX conference, the SCT successfully re-started operations in LHC Run-3 (2022-2025). The operation condition of SCT from LHC Run-3 is the same as those in Run-2 which came with high instantaneous luminosity and pileup conditions that were far in excess of what the SCT...
Autores principales: | Yacoob, Sahal, ATLAS SCT Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2023
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2875843 |
Ejemplares similares
-
The performance and operational experience of ATLAS SemiConductor Tracker in Run-2 at LHC
por: Grancagnolo, Sergio, et al.
Publicado: (2021) -
The performance and operational experience of ATLAS Semiconductor Tracker in Run-2 at LHC
por: Grancagnolo, Sergio, et al.
Publicado: (2021) -
Operational Experience of the ATLAS SemiConductor Tracker and Pixel Detector
por: Robinson, Dave
Publicado: (2016) -
The operational experience and performance of the ATLAS SCT during Run-2 and LS2, and the first impression from Run3 operations.
por: ATLAS SCT Collaboration, et al.
Publicado: (2023) -
The ATLAS SemiConductor Tracker Operation and Performance
por: Pater, J
Publicado: (2011)