Cargando…
AUP first Pre-Series Cold Mass Installation into the Cryostat
For the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2023
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2875969 |
_version_ | 1780978924245745664 |
---|---|
author | Rabehl, R Feher, S Ramos, D Strauss, T Struik, M |
author_facet | Rabehl, R Feher, S Ramos, D Strauss, T Struik, M |
author_sort | Rabehl, R |
collection | CERN |
description | For the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested, and delivered to CERN. The first LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during fall 2022 and spring/summer 2023, respectively. This paper summarizes the assembly process and experience of the first LQXFA Cryostat Assembly at FNAL. |
id | cern-2875969 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2023 |
record_format | invenio |
spelling | cern-28759692023-10-18T19:08:05Zhttp://cds.cern.ch/record/2875969engRabehl, RFeher, SRamos, DStrauss, TStruik, MAUP first Pre-Series Cold Mass Installation into the CryostatParticle Physics - ExperimentParticle Physics - PhenomenologyParticle Physics - TheoryFor the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested, and delivered to CERN. The first LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during fall 2022 and spring/summer 2023, respectively. This paper summarizes the assembly process and experience of the first LQXFA Cryostat Assembly at FNAL.FERMILAB-CONF-23-532-TDoai:cds.cern.ch:28759692023 |
spellingShingle | Particle Physics - Experiment Particle Physics - Phenomenology Particle Physics - Theory Rabehl, R Feher, S Ramos, D Strauss, T Struik, M AUP first Pre-Series Cold Mass Installation into the Cryostat |
title | AUP first Pre-Series Cold Mass Installation into the Cryostat |
title_full | AUP first Pre-Series Cold Mass Installation into the Cryostat |
title_fullStr | AUP first Pre-Series Cold Mass Installation into the Cryostat |
title_full_unstemmed | AUP first Pre-Series Cold Mass Installation into the Cryostat |
title_short | AUP first Pre-Series Cold Mass Installation into the Cryostat |
title_sort | aup first pre-series cold mass installation into the cryostat |
topic | Particle Physics - Experiment Particle Physics - Phenomenology Particle Physics - Theory |
url | http://cds.cern.ch/record/2875969 |
work_keys_str_mv | AT rabehlr aupfirstpreseriescoldmassinstallationintothecryostat AT fehers aupfirstpreseriescoldmassinstallationintothecryostat AT ramosd aupfirstpreseriescoldmassinstallationintothecryostat AT strausst aupfirstpreseriescoldmassinstallationintothecryostat AT struikm aupfirstpreseriescoldmassinstallationintothecryostat |