Cargando…

AUP first Pre-Series Cold Mass Installation into the Cryostat

For the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat...

Descripción completa

Detalles Bibliográficos
Autores principales: Rabehl, R, Feher, S, Ramos, D, Strauss, T, Struik, M
Lenguaje:eng
Publicado: 2023
Materias:
Acceso en línea:http://cds.cern.ch/record/2875969
_version_ 1780978924245745664
author Rabehl, R
Feher, S
Ramos, D
Strauss, T
Struik, M
author_facet Rabehl, R
Feher, S
Ramos, D
Strauss, T
Struik, M
author_sort Rabehl, R
collection CERN
description For the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested, and delivered to CERN. The first LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during fall 2022 and spring/summer 2023, respectively. This paper summarizes the assembly process and experience of the first LQXFA Cryostat Assembly at FNAL.
id cern-2875969
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2023
record_format invenio
spelling cern-28759692023-10-18T19:08:05Zhttp://cds.cern.ch/record/2875969engRabehl, RFeher, SRamos, DStrauss, TStruik, MAUP first Pre-Series Cold Mass Installation into the CryostatParticle Physics - ExperimentParticle Physics - PhenomenologyParticle Physics - TheoryFor the HiLumi LHC Upgrade (HL-LHC), new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP), ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested, and delivered to CERN. The first LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during fall 2022 and spring/summer 2023, respectively. This paper summarizes the assembly process and experience of the first LQXFA Cryostat Assembly at FNAL.FERMILAB-CONF-23-532-TDoai:cds.cern.ch:28759692023
spellingShingle Particle Physics - Experiment
Particle Physics - Phenomenology
Particle Physics - Theory
Rabehl, R
Feher, S
Ramos, D
Strauss, T
Struik, M
AUP first Pre-Series Cold Mass Installation into the Cryostat
title AUP first Pre-Series Cold Mass Installation into the Cryostat
title_full AUP first Pre-Series Cold Mass Installation into the Cryostat
title_fullStr AUP first Pre-Series Cold Mass Installation into the Cryostat
title_full_unstemmed AUP first Pre-Series Cold Mass Installation into the Cryostat
title_short AUP first Pre-Series Cold Mass Installation into the Cryostat
title_sort aup first pre-series cold mass installation into the cryostat
topic Particle Physics - Experiment
Particle Physics - Phenomenology
Particle Physics - Theory
url http://cds.cern.ch/record/2875969
work_keys_str_mv AT rabehlr aupfirstpreseriescoldmassinstallationintothecryostat
AT fehers aupfirstpreseriescoldmassinstallationintothecryostat
AT ramosd aupfirstpreseriescoldmassinstallationintothecryostat
AT strausst aupfirstpreseriescoldmassinstallationintothecryostat
AT struikm aupfirstpreseriescoldmassinstallationintothecryostat