Cargando…
AA beam requirements during the 2nd running-in period (23 October to 22 December)
Autor principal: | Koziol, H |
---|---|
Lenguaje: | eng |
Publicado: |
1980
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2877619 |
Ejemplares similares
-
Physics Run Analysis No. 3 - 1977, Periods 8 and 9 - 21st October to 22nd December 1977
por: Lemeilleur, F, et al.
Publicado: (1978) -
Physics Run Analysis No. 4 - 1976, Periods 8 and 9 (2nd November - 22nd December, 1976)
por: Verbeeck, F, et al.
Publicado: (1977) -
Physics Run Analysis No. 5 - 1974, Run 541 to 569, Periods 8, 9 and 10 (23rd October - 20th December, 1974)
por: Lemeilleur, F, et al.
Publicado: (1975) -
Transfer of protons to the West Hall and beam splitting during the runs on 22/23 and 29/30 October, 1976
por: Evans, L, et al.
Publicado: (1976) -
Influence of the Booster on the ISR Circulating Beams, Test 22nd December 1976
por: Brand, K, et al.
Publicado: (1977)