Cargando…
Report on the maintenance work carried out on the fast bumper system during the PS shut down 18-25th July, 1977
Autor principal: | Grier, D |
---|---|
Lenguaje: | eng |
Publicado: |
1977
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2877949 |
Ejemplares similares
-
Report on the maintenance work carried out on the fast bumper system during the shut down May 9th-June 9th, 1977
por: Grier, D
Publicado: (1977) -
Note on fast bumper maintenance work carried out during the long shut down January/February 1978
por: Grier, D
Publicado: (1978) -
Demarrage du PS apres le shut-down de 1977
por: Azzoni, G, et al.
Publicado: (1977) -
P.S. Shut-down June 20 - July 1, 1960
por: Standley, P H
Publicado: (1960) -
List of work to be carried out during September shut-down
por: Brianti, G
Publicado: (1960)