Report on the maintenance work carried out on the fast bumper system during the shut down May 9th-June 9th, 1977
Autor principal: | Grier, D |
---|---|
Lenguaje: | eng |
Publicado: |
1977
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2877959 |
Ejemplares similares
-
Report on the maintenance work carried out on the fast bumper system during the PS shut down 18-25th July, 1977
por: Grier, D
Publicado: (1977) -
Note on fast bumper maintenance work carried out during the long shut down January/February 1978
por: Grier, D
Publicado: (1978) -
List of work to be carried out during September shut-down
por: Brianti, G
Publicado: (1960) -
Fast Bumper System - technical description
por: Grier, D
Publicado: (1978) -
SC status report: 14th March 1977 to 6th June 1977
por: Standley, P H
Publicado: (1977)