Cargando…
Special instruction for the Engineer in Charge: Long Bubble Chamber run (21.3 to 24.3.60)
Autores principales: | Brianti, G, Bonaudi, F, Freeman, J Y |
---|---|
Lenguaje: | eng |
Publicado: |
1960
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2878173 |
Ejemplares similares
-
Special instructions for the Engineer-in-Charge long run for counter teams (13.6.60 to 16.6.60): An up-to-date copy of this will be kept in the "Instructions to E.i.C." file in the M.C.R.
por: Bonaudi, F, et al.
Publicado: (1960) -
Special instructions for Engineer-in-Charge: Run with Hydrogen Target; 18th. and 19th. July 1960
por: Bonaudi, F, et al.
Publicado: (1960) -
Instructions to E.i.C. No. 5: Target operation for Bubble Chamber Run
por: Reich, K H
Publicado: (1960) -
Special Instructions for Engineer-in-Charge P.S. Operational Security: Radiation: Preparations for Cloud Chamber Run; special access arrangements for Preiswerk group to B.C.Region on 13/9/60
por: Freeman, J Y
Publicado: (1960) -
Bubble Chamber Run
por: Taylor, C S
Publicado: (1960)