Cargando…
Special instructions for the Engineer-in-Charge long run for counter teams (13.6.60 to 16.6.60): An up-to-date copy of this will be kept in the "Instructions to E.i.C." file in the M.C.R.
Autores principales: | Bonaudi, F, Brianti, G, Reich, K H |
---|---|
Lenguaje: | eng |
Publicado: |
1960
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2878187 |
Ejemplares similares
-
Instruction to E.i.C. No.2: Procedure for plate exposure
por: Brianti, G
Publicado: (1960) -
Instruction to E.i.C. no. 3: Preparations for beams and experimental apparates
por: Bonaudi, F
Publicado: (1960) -
Instructions No.1 for the E.i.C. (Rev.)
Publicado: (1960) -
General instructions for the Engineer-in-Charge (E.i.C.)
por: Germain, P
Publicado: (1959) -
Special instruction for the Engineer in Charge: Long Bubble Chamber run (21.3 to 24.3.60)
por: Brianti, G, et al.
Publicado: (1960)