Cargando…

Report of the 1995 bunch train study group

In order to raise the luminosity LEP was operated in 1995 with four equidistant trains of bunches in each beam, instead of the usual four or eight single bunches. Each train consisted of up to four bunches. The bunch spacing was about 74 m. A comparison is made between the plans and expectations in...

Descripción completa

Detalles Bibliográficos
Autores principales: Bovet, Claude, Brunner, O C, Goddard, B, Herr, Werner, Von Holtey, G, Keil, Eberhard, Lamont, M, Meddahi, Malika, Peschardt, E, Poole, John
Lenguaje:eng
Publicado: 1996
Materias:
Acceso en línea:http://cds.cern.ch/record/304761
_version_ 1780889739216289792
author Bovet, Claude
Brunner, O C
Goddard, B
Herr, Werner
Von Holtey, G
Keil, Eberhard
Lamont, M
Meddahi, Malika
Peschardt, E
Poole, John
author_facet Bovet, Claude
Brunner, O C
Goddard, B
Herr, Werner
Von Holtey, G
Keil, Eberhard
Lamont, M
Meddahi, Malika
Peschardt, E
Poole, John
author_sort Bovet, Claude
collection CERN
description In order to raise the luminosity LEP was operated in 1995 with four equidistant trains of bunches in each beam, instead of the usual four or eight single bunches. Each train consisted of up to four bunches. The bunch spacing was about 74 m. A comparison is made between the plans and expectations in the 1994 Bunch Train Report, and the actual implementation and observations in 1995. The observations made during machine development sessions and during routine operation for physics are discussed. The effects of the scheme on the background in the LEP experiments are anlysed. The performance of LEP equipment, in particular of beam instrumentation electrostatic separators, and the RF systems is presented. The plans for running LEP with bunch trains in 1996 are briefly outlined.
id cern-304761
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1996
record_format invenio
spelling cern-3047612023-05-05T12:57:24Zhttp://cds.cern.ch/record/304761engBovet, ClaudeBrunner, O CGoddard, BHerr, WernerVon Holtey, GKeil, EberhardLamont, MMeddahi, MalikaPeschardt, EPoole, JohnReport of the 1995 bunch train study groupAccelerators and Storage RingsIn order to raise the luminosity LEP was operated in 1995 with four equidistant trains of bunches in each beam, instead of the usual four or eight single bunches. Each train consisted of up to four bunches. The bunch spacing was about 74 m. A comparison is made between the plans and expectations in the 1994 Bunch Train Report, and the actual implementation and observations in 1995. The observations made during machine development sessions and during routine operation for physics are discussed. The effects of the scheme on the background in the LEP experiments are anlysed. The performance of LEP equipment, in particular of beam instrumentation electrostatic separators, and the RF systems is presented. The plans for running LEP with bunch trains in 1996 are briefly outlined.CERN-SL-96-012-APoai:cds.cern.ch:3047611996-04-30
spellingShingle Accelerators and Storage Rings
Bovet, Claude
Brunner, O C
Goddard, B
Herr, Werner
Von Holtey, G
Keil, Eberhard
Lamont, M
Meddahi, Malika
Peschardt, E
Poole, John
Report of the 1995 bunch train study group
title Report of the 1995 bunch train study group
title_full Report of the 1995 bunch train study group
title_fullStr Report of the 1995 bunch train study group
title_full_unstemmed Report of the 1995 bunch train study group
title_short Report of the 1995 bunch train study group
title_sort report of the 1995 bunch train study group
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/304761
work_keys_str_mv AT bovetclaude reportofthe1995bunchtrainstudygroup
AT brunneroc reportofthe1995bunchtrainstudygroup
AT goddardb reportofthe1995bunchtrainstudygroup
AT herrwerner reportofthe1995bunchtrainstudygroup
AT vonholteyg reportofthe1995bunchtrainstudygroup
AT keileberhard reportofthe1995bunchtrainstudygroup
AT lamontm reportofthe1995bunchtrainstudygroup
AT meddahimalika reportofthe1995bunchtrainstudygroup
AT peschardte reportofthe1995bunchtrainstudygroup
AT poolejohn reportofthe1995bunchtrainstudygroup