Cargando…
Report on the ISR
During 1974, the period covered by this report, the ISR were in operation for 3500 h. Operational performance throughout the year has profited from the regular application of the methods developed at the end of 1973, viz. gradual compensation of the space-charge tune shift during stacking followed b...
Autor principal: | Schnell, Wolfgang |
---|---|
Lenguaje: | eng |
Publicado: |
1975
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TNS.1975.4327886 http://cds.cern.ch/record/310529 |
Ejemplares similares
-
Bunching the beam in the ISR
por: Schnell, Wolfgang
Publicado: (1965) -
Machine studies in the ISR
por: Schnell, Wolfgang
Publicado: (1973) -
Operating results from ISR
por: Schnell, Wolfgang
Publicado: (1973) -
Septum magnets in the ISR injection lines
por: Schnell, Wolfgang
Publicado: (1973) -
Experimental observation of beam behaviour in the ISR
por: Schnell, Wolfgang
Publicado: (1971)