Cargando…

CLIC test beam facilities: status and results

CERN is studying the feasibility of building a 1 TeV c.m. e+e- linear collider (CLIC) based on 30 GHz accelerating structures and RF power production from a low energy, high intensity drive linac. Two major challenges of the CLIC two-beam scheme are the generation of the high intensity drive beam an...

Descripción completa

Detalles Bibliográficos
Autor principal: Wilson, Ian H
Lenguaje:eng
Publicado: CERN 1996
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-1996-007.552
http://cds.cern.ch/record/311365
_version_ 1780890105736593408
author Wilson, Ian H
author_facet Wilson, Ian H
author_sort Wilson, Ian H
collection CERN
description CERN is studying the feasibility of building a 1 TeV c.m. e+e- linear collider (CLIC) based on 30 GHz accelerating structures and RF power production from a low energy, high intensity drive linac. Two major challenges of the CLIC two-beam scheme are the generation of the high intensity drive beam and the extraction of 30 GHz RF power using transfer structures. Two test facilities are currently being used to study these specific problems. The CLIC Test Facility (CTF) is a purpose-built CERN facility to study the generation of the drive beam by photo-injectors, the generation of 30 GHz RF power, and the testing of components. This facility has produced single bunch charges of 35 nC with a bunch length of 14 ps (FWHH) and up to 76 MW of 30 GHz RF power. It is at present being updated to a 10 m long two-beam test accelerator producing 480 MW of 30 GHz RF peak power and accelerating electron bunches with gradients of 80 MV/m. The FEL Test Facility at CESTA (Bordeaux) is being used to study the generation of the CLIC drive beam by direct bunching at 30 GHz. This facility has recently made the first direct observation of beam bunching by a high power microwave FEL. The status of these two test facilities and the results obtained are given.
id cern-311365
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1996
publisher CERN
record_format invenio
spelling cern-3113652023-08-17T09:44:22Zdoi:10.5170/CERN-1996-007.552http://cds.cern.ch/record/311365engWilson, Ian HCLIC test beam facilities: status and resultsAccelerators and Storage RingsCERN is studying the feasibility of building a 1 TeV c.m. e+e- linear collider (CLIC) based on 30 GHz accelerating structures and RF power production from a low energy, high intensity drive linac. Two major challenges of the CLIC two-beam scheme are the generation of the high intensity drive beam and the extraction of 30 GHz RF power using transfer structures. Two test facilities are currently being used to study these specific problems. The CLIC Test Facility (CTF) is a purpose-built CERN facility to study the generation of the drive beam by photo-injectors, the generation of 30 GHz RF power, and the testing of components. This facility has produced single bunch charges of 35 nC with a bunch length of 14 ps (FWHH) and up to 76 MW of 30 GHz RF power. It is at present being updated to a 10 m long two-beam test accelerator producing 480 MW of 30 GHz RF peak power and accelerating electron bunches with gradients of 80 MV/m. The FEL Test Facility at CESTA (Bordeaux) is being used to study the generation of the CLIC drive beam by direct bunching at 30 GHz. This facility has recently made the first direct observation of beam bunching by a high power microwave FEL. The status of these two test facilities and the results obtained are given.CERNCERN-PS-96-033-LPCLIC-Note-313oai:cds.cern.ch:3113651996-09-09
spellingShingle Accelerators and Storage Rings
Wilson, Ian H
CLIC test beam facilities: status and results
title CLIC test beam facilities: status and results
title_full CLIC test beam facilities: status and results
title_fullStr CLIC test beam facilities: status and results
title_full_unstemmed CLIC test beam facilities: status and results
title_short CLIC test beam facilities: status and results
title_sort clic test beam facilities: status and results
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-1996-007.552
http://cds.cern.ch/record/311365
work_keys_str_mv AT wilsonianh clictestbeamfacilitiesstatusandresults