Cargando…

CLIC test beam facilities: status and results

CERN is studying the feasibility of building a 1 TeV c.m. e+e- linear collider (CLIC) based on 30 GHz accelerating structures and RF power production from a low energy, high intensity drive linac. Two major challenges of the CLIC two-beam scheme are the generation of the high intensity drive beam an...

Descripción completa

Detalles Bibliográficos
Autor principal: Wilson, Ian H
Lenguaje:eng
Publicado: CERN 1996
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-1996-007.552
http://cds.cern.ch/record/311365

Ejemplares similares