Commissioning and experience in stripping, filtering and measuring the 4.2 MeV/u lead ion beam at CERN Linac 3
The new CERN Heavy Ion Linac (Linac3) accelerates a Pb27+ beam to 4.2 MeV/u. The beam is then stripped to Pb53+ by a carbon foil, and, after stripping, a 12 m filter line prepares the beam for the injection into the Proton Synchrotron Booster (PSB). The filter line eliminates the unwanted charge sta...
Autores principales: | Catalan-Lasheras, N, Crescenti, M, Vretenar, Maurizio |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
1996
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-1996-007.363 http://cds.cern.ch/record/318968 |
Ejemplares similares
-
Commissioning and experience in stripping, filtering and measuring the 4.2 MEV/U lead ion beam at CERN LINAC3
por: Catalan Lasheras, N, et al.
Publicado: (1997) -
Beam Commissioning of Linac4 up to 12 MeV
por: Dimov, Veliko, et al.
Publicado: (2015) -
Beam Instrumentation Performance during Commissioning of CERN's Linac-4 to 50 MeV and 100 MeV
por: Raich, Uli, et al.
Publicado: (2016) -
Commissioning of the Linac4 RFQ at the 3 MeV test stand
por: Rossi, C, et al.
Publicado: (2013) -
Single cavity design for the quasi-Alvarez Linac between 0.24MeV/u and 4.2 MeV/u
por: Warner, D J, et al.
Publicado: (1991)