Cargando…

Pb injector at CERN

For the CERN Lead Ion Accelerating Facility (achieved within a collaboration of several outside laboratories and with financial help of some member states) a new dedicated Linac has been built. This Linac has been installed in 1994 and served during two extended physics runs. This paper reviews the...

Descripción completa

Detalles Bibliográficos
Autor principal: Haseroth, H
Lenguaje:eng
Publicado: CERN 1996
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-1996-007.283
http://cds.cern.ch/record/319069
Descripción
Sumario:For the CERN Lead Ion Accelerating Facility (achieved within a collaboration of several outside laboratories and with financial help of some member states) a new dedicated Linac has been built. This Linac has been installed in 1994 and served during two extended physics runs. This paper reviews the main characteristics of this machine and describes the first operational experience. Emphasis is put on new features of this accelerator, its associated equipment and on the peculiarities of heavy ions.