Cargando…

Design and construction of a 500 KW CW, 400 MHz klystron to be used as RF power source for LHC/RF component tests

A 500 kW cw klystron operating at 400 MHz was developed and constructed jointly by CERN and SLAC for use as a high-power source at CERN for testing LHC/RF components such as circulators, RF absorbers and superconducting cavities with their input couplers. The design is a modification of the 353 MHz...

Descripción completa

Detalles Bibliográficos
Autores principales: Frischholz, Hans, Fowkes, W R, Pearson, C
Lenguaje:eng
Publicado: 1997
Materias:
Acceso en línea:http://cds.cern.ch/record/328268
_version_ 1780891015901609984
author Frischholz, Hans
Fowkes, W R
Pearson, C
author_facet Frischholz, Hans
Fowkes, W R
Pearson, C
author_sort Frischholz, Hans
collection CERN
description A 500 kW cw klystron operating at 400 MHz was developed and constructed jointly by CERN and SLAC for use as a high-power source at CERN for testing LHC/RF components such as circulators, RF absorbers and superconducting cavities with their input couplers. The design is a modification of the 353 MHz SLAC PEP-I klystron. More than 80% of the original PEP-I tube parts could thus be incorporated in the LHC test klystron which resulted in lower engineering costs as well as reduced development and construction time. The physical length between cathode plane and upper pole plate was kept unchanged so that a PEP-I tube focusing solenoid, available at CERN, could be re-used. With the aid of the klystron simulation codes JPNDISK and CONDOR, the design of the LHC tube was accomplished, which resulted in a tube with noticeably higher efficiency than its predecessor, the PEP-I klystron. The integrated cavities were redesigned using SUPERFISH and the output coupling circuit, which also required redesigning, was done with the aid of MAFIA. Details of the tube development and test results are presented.
id cern-328268
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1997
record_format invenio
spelling cern-3282682023-06-27T15:40:36Zhttp://cds.cern.ch/record/328268engFrischholz, HansFowkes, W RPearson, CDesign and construction of a 500 KW CW, 400 MHz klystron to be used as RF power source for LHC/RF component testsAccelerators and Storage RingsA 500 kW cw klystron operating at 400 MHz was developed and constructed jointly by CERN and SLAC for use as a high-power source at CERN for testing LHC/RF components such as circulators, RF absorbers and superconducting cavities with their input couplers. The design is a modification of the 353 MHz SLAC PEP-I klystron. More than 80% of the original PEP-I tube parts could thus be incorporated in the LHC test klystron which resulted in lower engineering costs as well as reduced development and construction time. The physical length between cathode plane and upper pole plate was kept unchanged so that a PEP-I tube focusing solenoid, available at CERN, could be re-used. With the aid of the klystron simulation codes JPNDISK and CONDOR, the design of the LHC tube was accomplished, which resulted in a tube with noticeably higher efficiency than its predecessor, the PEP-I klystron. The integrated cavities were redesigned using SUPERFISH and the output coupling circuit, which also required redesigning, was done with the aid of MAFIA. Details of the tube development and test results are presented.CERN-SL-97-039-RFoai:cds.cern.ch:3282681997-06-12
spellingShingle Accelerators and Storage Rings
Frischholz, Hans
Fowkes, W R
Pearson, C
Design and construction of a 500 KW CW, 400 MHz klystron to be used as RF power source for LHC/RF component tests
title Design and construction of a 500 KW CW, 400 MHz klystron to be used as RF power source for LHC/RF component tests
title_full Design and construction of a 500 KW CW, 400 MHz klystron to be used as RF power source for LHC/RF component tests
title_fullStr Design and construction of a 500 KW CW, 400 MHz klystron to be used as RF power source for LHC/RF component tests
title_full_unstemmed Design and construction of a 500 KW CW, 400 MHz klystron to be used as RF power source for LHC/RF component tests
title_short Design and construction of a 500 KW CW, 400 MHz klystron to be used as RF power source for LHC/RF component tests
title_sort design and construction of a 500 kw cw, 400 mhz klystron to be used as rf power source for lhc/rf component tests
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/328268
work_keys_str_mv AT frischholzhans designandconstructionofa500kwcw400mhzklystrontobeusedasrfpowersourceforlhcrfcomponenttests
AT fowkeswr designandconstructionofa500kwcw400mhzklystrontobeusedasrfpowersourceforlhcrfcomponenttests
AT pearsonc designandconstructionofa500kwcw400mhzklystrontobeusedasrfpowersourceforlhcrfcomponenttests