Cargando…
Managing the Real-time Behaviour of a Particle Beam Factory: The CERN Proton Synchrotron Complex and its Timing System Principles
In the CERN 26 Gev Proton Synchrotron (PS) accelerator network, super-cycles are defined as sequences of different kinds of beams produced repetitively [Fig.1]. Each of these beams is characterised by attributes such as particle type, beam energy, its route through the accelerator network, and the f...
Autores principales: | Bau, J C, Daems, G, Lewis, J, Philippe, J |
---|---|
Lenguaje: | eng |
Publicado: |
1997
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/23.710979 http://cds.cern.ch/record/335697 |
Ejemplares similares
-
Managing the real-time behaviour of a particle beam factory: the CERN proton synchrotron complex and its timing system principles
por: Bau, J-C, et al.
Publicado: (1997) -
Design of the optical system for the gamma factory proof of principle experiment at the CERN Super Proton Synchrotron
por: Martens, Aurélien, et al.
Publicado: (2022) -
Review of principles leading to design of CERN proton synchrotron
por: Goward, F K
Publicado: (1953) -
Performance of the New Neutrino Beam at the CERN Proton Synchrotron
por: Bertolotto, R, et al.
Publicado: (1967) -
Beam loss monitors comparison at the CERN Proton Synchrotron
por: Gilardoni, S S, et al.
Publicado: (2011)