Cargando…

A new concept for the water supply at CERN

The present state of the station Le Vengeron (the main pumping station supplying CERN with drinking water), and also to comply with the new Swiss standards impose a thorough consolidation and upgrade of this station which is shared with the Services Industriels de Genève (SIG). The total cost of the...

Descripción completa

Detalles Bibliográficos
Autor principal: Inigo-Golfin, J
Lenguaje:eng
Publicado: 1998
Materias:
Acceso en línea:http://cds.cern.ch/record/358712
Descripción
Sumario:The present state of the station Le Vengeron (the main pumping station supplying CERN with drinking water), and also to comply with the new Swiss standards impose a thorough consolidation and upgrade of this station which is shared with the Services Industriels de Genève (SIG). The total cost of the works (around 62 MCHF) would be shared proportionally to the nominal flow-rate demand which, at present, is of 2/3 for CERN and 1/3 for SIG. An alternative to the above is a complete review of CERN's water consumption, reducing our needs by half, thus allowing savings in both investment and operation. This reduction in investment cost would be diverted towards much needed consolidation works for the existing facilities within CERN. This paper also reviews the planning and possible ways for the execution of the works and the future responsibilities of operation of the water distribution systems (drinking and machine) inside CERN's sites.