Cargando…

A new concept for the water supply at CERN

The present state of the station Le Vengeron (the main pumping station supplying CERN with drinking water), and also to comply with the new Swiss standards impose a thorough consolidation and upgrade of this station which is shared with the Services Industriels de Genève (SIG). The total cost of the...

Descripción completa

Detalles Bibliográficos
Autor principal: Inigo-Golfin, J
Lenguaje:eng
Publicado: 1998
Materias:
Acceso en línea:http://cds.cern.ch/record/358712
_version_ 1780892589879197696
author Inigo-Golfin, J
author_facet Inigo-Golfin, J
author_sort Inigo-Golfin, J
collection CERN
description The present state of the station Le Vengeron (the main pumping station supplying CERN with drinking water), and also to comply with the new Swiss standards impose a thorough consolidation and upgrade of this station which is shared with the Services Industriels de Genève (SIG). The total cost of the works (around 62 MCHF) would be shared proportionally to the nominal flow-rate demand which, at present, is of 2/3 for CERN and 1/3 for SIG. An alternative to the above is a complete review of CERN's water consumption, reducing our needs by half, thus allowing savings in both investment and operation. This reduction in investment cost would be diverted towards much needed consolidation works for the existing facilities within CERN. This paper also reviews the planning and possible ways for the execution of the works and the future responsibilities of operation of the water distribution systems (drinking and machine) inside CERN's sites.
id cern-358712
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1998
record_format invenio
spelling cern-3587122019-09-30T06:29:59Zhttp://cds.cern.ch/record/358712engInigo-Golfin, JA new concept for the water supply at CERNEngineeringThe present state of the station Le Vengeron (the main pumping station supplying CERN with drinking water), and also to comply with the new Swiss standards impose a thorough consolidation and upgrade of this station which is shared with the Services Industriels de Genève (SIG). The total cost of the works (around 62 MCHF) would be shared proportionally to the nominal flow-rate demand which, at present, is of 2/3 for CERN and 1/3 for SIG. An alternative to the above is a complete review of CERN's water consumption, reducing our needs by half, thus allowing savings in both investment and operation. This reduction in investment cost would be diverted towards much needed consolidation works for the existing facilities within CERN. This paper also reviews the planning and possible ways for the execution of the works and the future responsibilities of operation of the water distribution systems (drinking and machine) inside CERN's sites.CERN-ST-98-013oai:cds.cern.ch:3587121998-03-31
spellingShingle Engineering
Inigo-Golfin, J
A new concept for the water supply at CERN
title A new concept for the water supply at CERN
title_full A new concept for the water supply at CERN
title_fullStr A new concept for the water supply at CERN
title_full_unstemmed A new concept for the water supply at CERN
title_short A new concept for the water supply at CERN
title_sort new concept for the water supply at cern
topic Engineering
url http://cds.cern.ch/record/358712
work_keys_str_mv AT inigogolfinj anewconceptforthewatersupplyatcern
AT inigogolfinj newconceptforthewatersupplyatcern