Cargando…
The PS 80 MHz cavities
As part of the preparation of the PS as injector for LHC, two new 80 MHz cavities have been designed and built at CERN. Bunches spaced by 25 ns and less than 4 ns long are required at injection into t he SPS. The bunch spacing is obtained with a 40 MHz system installed in the PS in 1996, but the nom...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/361131 |
_version_ | 1780892690915786752 |
---|---|
author | Grier, D G Jensen, E Losito, R Mitra, A K |
author_facet | Grier, D G Jensen, E Losito, R Mitra, A K |
author_sort | Grier, D G |
collection | CERN |
description | As part of the preparation of the PS as injector for LHC, two new 80 MHz cavities have been designed and built at CERN. Bunches spaced by 25 ns and less than 4 ns long are required at injection into t he SPS. The bunch spacing is obtained with a 40 MHz system installed in the PS in 1996, but the nominal small bunch length will only be obtained with the 80 MHz systems producing a total of 600 kV. Th ese systems also have the capability to accelerate leptons in the PS, providing a total of 400 kV with high duty cycle (25 %). The mechanical design is similar to that of the 40 MHz cavity with many c ommon parts, but cooling water circuits had to be added. The cavity is equipped with an efficient, pneumatically operated, coaxial short-circuit. The power coupling loop has the form of a wide strip t o minimize the ratio of self to mutual inductance. It has a DC insulation permitting multipactor suppression by a bias voltage. The final amplifier is mounted directly onto the cavity. A fast RF feedb ack with a loop gain of 44 dB reduces the Q to about 100. Higher-order-mode dampers designed and built at TRIUMF have been installed. |
id | cern-361131 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1998 |
record_format | invenio |
spelling | cern-3611312021-11-11T09:52:37Zhttp://cds.cern.ch/record/361131engGrier, D GJensen, ELosito, RMitra, A KThe PS 80 MHz cavitiesAccelerators and Storage RingsAs part of the preparation of the PS as injector for LHC, two new 80 MHz cavities have been designed and built at CERN. Bunches spaced by 25 ns and less than 4 ns long are required at injection into t he SPS. The bunch spacing is obtained with a 40 MHz system installed in the PS in 1996, but the nominal small bunch length will only be obtained with the 80 MHz systems producing a total of 600 kV. Th ese systems also have the capability to accelerate leptons in the PS, providing a total of 400 kV with high duty cycle (25 %). The mechanical design is similar to that of the 40 MHz cavity with many c ommon parts, but cooling water circuits had to be added. The cavity is equipped with an efficient, pneumatically operated, coaxial short-circuit. The power coupling loop has the form of a wide strip t o minimize the ratio of self to mutual inductance. It has a DC insulation permitting multipactor suppression by a bias voltage. The final amplifier is mounted directly onto the cavity. A fast RF feedb ack with a loop gain of 44 dB reduces the Q to about 100. Higher-order-mode dampers designed and built at TRIUMF have been installed.CERN-PS-98-021-RFoai:cds.cern.ch:3611311998-06-03 |
spellingShingle | Accelerators and Storage Rings Grier, D G Jensen, E Losito, R Mitra, A K The PS 80 MHz cavities |
title | The PS 80 MHz cavities |
title_full | The PS 80 MHz cavities |
title_fullStr | The PS 80 MHz cavities |
title_full_unstemmed | The PS 80 MHz cavities |
title_short | The PS 80 MHz cavities |
title_sort | ps 80 mhz cavities |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/361131 |
work_keys_str_mv | AT grierdg theps80mhzcavities AT jensene theps80mhzcavities AT lositor theps80mhzcavities AT mitraak theps80mhzcavities AT grierdg ps80mhzcavities AT jensene ps80mhzcavities AT lositor ps80mhzcavities AT mitraak ps80mhzcavities |