Cargando…

Preparation of the SPS as LHC injector

A major project (SLI) for the preparation the SPS in its role as the final link in the injector chain to the LHC was launched one year ago [1,2]. The major areas of work include the upgrade of the RF and the injection systems, together with the provision of a new extraction channel to serve ring 2 o...

Descripción completa

Detalles Bibliográficos
Autores principales: Collier, Paul, Goddard, B
Lenguaje:eng
Publicado: 1998
Materias:
Acceso en línea:http://cds.cern.ch/record/361251
_version_ 1780892694585802752
author Collier, Paul
Goddard, B
author_facet Collier, Paul
Goddard, B
author_sort Collier, Paul
collection CERN
description A major project (SLI) for the preparation the SPS in its role as the final link in the injector chain to the LHC was launched one year ago [1,2]. The major areas of work include the upgrade of the RF and the injection systems, together with the provision of a new extraction channel to serve ring 2 of the LHC. In addition, studies have been made on the ability of the SPS to meet the stringent trans verse and longitudinal beam requirements of the LHC. This has lead to several other programmes of work including upgrades to the beam instrumentation, the transverse damper and the shielding of over 8 00 inter-magnet pumping ports to reduce the impedance of the machine. The planning of the project is influenced by the continued operation of LEP and the proposed new long base-line neutrino facility (NGS). In addition, during the machine upgrades, the SPS must continue to deliver high quality proton beams to the fixed-target experimental community and for an extensive range of experimental detect or test beams. The major areas of work to complete the upgrade will be explained, together with the present status of the project and the future planning.
id cern-361251
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1998
record_format invenio
spelling cern-3612512023-05-05T13:07:27Zhttp://cds.cern.ch/record/361251engCollier, PaulGoddard, BPreparation of the SPS as LHC injectorAccelerators and Storage RingsA major project (SLI) for the preparation the SPS in its role as the final link in the injector chain to the LHC was launched one year ago [1,2]. The major areas of work include the upgrade of the RF and the injection systems, together with the provision of a new extraction channel to serve ring 2 of the LHC. In addition, studies have been made on the ability of the SPS to meet the stringent trans verse and longitudinal beam requirements of the LHC. This has lead to several other programmes of work including upgrades to the beam instrumentation, the transverse damper and the shielding of over 8 00 inter-magnet pumping ports to reduce the impedance of the machine. The planning of the project is influenced by the continued operation of LEP and the proposed new long base-line neutrino facility (NGS). In addition, during the machine upgrades, the SPS must continue to deliver high quality proton beams to the fixed-target experimental community and for an extensive range of experimental detect or test beams. The major areas of work to complete the upgrade will be explained, together with the present status of the project and the future planning.CERN-SL-98-049-OPoai:cds.cern.ch:3612511998
spellingShingle Accelerators and Storage Rings
Collier, Paul
Goddard, B
Preparation of the SPS as LHC injector
title Preparation of the SPS as LHC injector
title_full Preparation of the SPS as LHC injector
title_fullStr Preparation of the SPS as LHC injector
title_full_unstemmed Preparation of the SPS as LHC injector
title_short Preparation of the SPS as LHC injector
title_sort preparation of the sps as lhc injector
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/361251
work_keys_str_mv AT collierpaul preparationofthespsaslhcinjector
AT goddardb preparationofthespsaslhcinjector