Cargando…
Workflow management in the assembly of CMS ECAL
Autores principales: | Baker, N, Bazan, A, Estrella, F, Kovács, Z, Le Flour, T, Le Goff, J M, Leonardi, E, Lieunard, S, McClatchey, R, Vialle, J P |
---|---|
Lenguaje: | eng |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/364548 |
Ejemplares similares
-
From Design to Production Control Through the Integration of Engineering Data Management and Workflow Management Systems
por: Le Goff, J M, et al.
Publicado: (1997) -
C.R.I.S.T.A.L. Concurrent Repository & Information System for Tracking Assembly and production Lifecycles: A data capture and production management tool for the assembly and construction of the CMS ECAL detector
por: Le Goff, J-M., et al.
Publicado: (2001) -
Detector Construction Management and Quality Control: Establishing and Using a CRISTAL System
por: Le Goff, J.M., et al.
Publicado: (1998) -
The use of production management techniques in the construction of large scale physics detectors
por: Bazan, A, et al.
Publicado: (1999) -
Getting Physics Data From the CMS ECAL Construction Database
por: Le Goff, J.M., et al.
Publicado: (1999)