Cargando…

Demonstration of two-beam and 30 GHz power production in the CLIC test facility

The Compact Linear Collider (CLIC) Test Facility (CTF II) at CERN has recently demonstrated Two-Beam power production and acceleration at 30 GHz. With 41 MW of 30 GHz power produced in 14 ns pulses at a repetition rate of 5 Hz, the main beam has been accelerated by 28 MeV with fields of 59 MV/m. The...

Descripción completa

Detalles Bibliográficos
Autores principales: Bossart, Rudolf, Braun, Hans Heinrich, Carron, G, Chanudet, M, Chautard, F, Delahaye, J P, Godot, J C, Hutchins, S, Martínez, C, Suberlucq, Guy, Tenenbaum, P G, Thorndahl, L, Trautner, H, Valentini, M, Wilson, Ian H, Wuensch, Walter
Lenguaje:eng
Publicado: 1998
Materias:
Acceso en línea:https://dx.doi.org/10.1063/1.59015
http://cds.cern.ch/record/371347
_version_ 1780893139806978048
author Bossart, Rudolf
Braun, Hans Heinrich
Carron, G
Chanudet, M
Chautard, F
Delahaye, J P
Godot, J C
Hutchins, S
Martínez, C
Suberlucq, Guy
Tenenbaum, P G
Thorndahl, L
Trautner, H
Valentini, M
Wilson, Ian H
Wuensch, Walter
author_facet Bossart, Rudolf
Braun, Hans Heinrich
Carron, G
Chanudet, M
Chautard, F
Delahaye, J P
Godot, J C
Hutchins, S
Martínez, C
Suberlucq, Guy
Tenenbaum, P G
Thorndahl, L
Trautner, H
Valentini, M
Wilson, Ian H
Wuensch, Walter
author_sort Bossart, Rudolf
collection CERN
description The Compact Linear Collider (CLIC) Test Facility (CTF II) at CERN has recently demonstrated Two-Beam power production and acceleration at 30 GHz. With 41 MW of 30 GHz power produced in 14 ns pulses at a repetition rate of 5 Hz, the main beam has been accelerated by 28 MeV with fields of 59 MV/m. The 30 GHz RF power is extracted in low impedance decelerating structures from a low-energy, high-current "drive beam" which runs parallel to the main beam. The average current in the drive-beam train is 25 A, while the peak current exceeds 2 kA. Crosschecks between measured drive-beam charge, 30 GHz power and main-beam energy gain are in good agreement. In this paper, some relevant experimental and technical issues on drive-beam generation, two-beam power production and acceleration are presented.
id cern-371347
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1998
record_format invenio
spelling cern-3713472023-07-20T15:03:13Zdoi:10.1063/1.59015http://cds.cern.ch/record/371347engBossart, RudolfBraun, Hans HeinrichCarron, GChanudet, MChautard, FDelahaye, J PGodot, J CHutchins, SMartínez, CSuberlucq, GuyTenenbaum, P GThorndahl, LTrautner, HValentini, MWilson, Ian HWuensch, WalterDemonstration of two-beam and 30 GHz power production in the CLIC test facilityAccelerators and Storage RingsThe Compact Linear Collider (CLIC) Test Facility (CTF II) at CERN has recently demonstrated Two-Beam power production and acceleration at 30 GHz. With 41 MW of 30 GHz power produced in 14 ns pulses at a repetition rate of 5 Hz, the main beam has been accelerated by 28 MeV with fields of 59 MV/m. The 30 GHz RF power is extracted in low impedance decelerating structures from a low-energy, high-current "drive beam" which runs parallel to the main beam. The average current in the drive-beam train is 25 A, while the peak current exceeds 2 kA. Crosschecks between measured drive-beam charge, 30 GHz power and main-beam energy gain are in good agreement. In this paper, some relevant experimental and technical issues on drive-beam generation, two-beam power production and acceleration are presented.CERN-PS-98-060-LPCLIC-Note-382oai:cds.cern.ch:3713471998-11-13
spellingShingle Accelerators and Storage Rings
Bossart, Rudolf
Braun, Hans Heinrich
Carron, G
Chanudet, M
Chautard, F
Delahaye, J P
Godot, J C
Hutchins, S
Martínez, C
Suberlucq, Guy
Tenenbaum, P G
Thorndahl, L
Trautner, H
Valentini, M
Wilson, Ian H
Wuensch, Walter
Demonstration of two-beam and 30 GHz power production in the CLIC test facility
title Demonstration of two-beam and 30 GHz power production in the CLIC test facility
title_full Demonstration of two-beam and 30 GHz power production in the CLIC test facility
title_fullStr Demonstration of two-beam and 30 GHz power production in the CLIC test facility
title_full_unstemmed Demonstration of two-beam and 30 GHz power production in the CLIC test facility
title_short Demonstration of two-beam and 30 GHz power production in the CLIC test facility
title_sort demonstration of two-beam and 30 ghz power production in the clic test facility
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1063/1.59015
http://cds.cern.ch/record/371347
work_keys_str_mv AT bossartrudolf demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT braunhansheinrich demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT carrong demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT chanudetm demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT chautardf demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT delahayejp demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT godotjc demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT hutchinss demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT martinezc demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT suberlucqguy demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT tenenbaumpg demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT thorndahll demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT trautnerh demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT valentinim demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT wilsonianh demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility
AT wuenschwalter demonstrationoftwobeamand30ghzpowerproductionintheclictestfacility