Cargando…

Away-Day: a Review of the Preparation of the CTF3 Design

Schedule: The route to CLIC and objectives of the brainstorming session (moderator: J.P. Delahaye)The various possible phases of the Test Facility (moderator: I. Wilson)Constraints from the LPI: schedule-building-components (moderator: J.P. Potier)The injector system based on thermoionic gun (modera...

Descripción completa

Detalles Bibliográficos
Autor principal: Guemara, H
Lenguaje:eng
Publicado: CERN 1998
Materias:
Acceso en línea:http://cds.cern.ch/record/372938
Descripción
Sumario:Schedule: The route to CLIC and objectives of the brainstorming session (moderator: J.P. Delahaye)The various possible phases of the Test Facility (moderator: I. Wilson)Constraints from the LPI: schedule-building-components (moderator: J.P. Potier)The injector system based on thermoionic gun (moderator: L. Rinolfi)Possible option of photo-injector (moderators: G. Suberlucq - S. Hutchins)Trade off between energy and current in CTF3 (moderator: R. Corsini)The RF power source of the drive beam accelerator (moderator: P. Pearce)RF pulse compression for the drive beam accelerator (moderator: Y. Syratchev)The drive beam accelerator (moderator: L. Thorndahl)Beam dynamics in drive beam accelerator (moderators: G. Guignard - D. Schulte)The combiner ring and delay loop (moderator: R. Corsini)The 30 GHz modules of the drive beam decelerator and main beam accelerator (moderator: W. Wuensch)Possible tests in CTF2 in preparation for CTF3 (moderator: H. Braun) Conclusion programme of work (moderator: J.P. Delahaye)