Cargando…
Away-Day: a Review of the Preparation of the CTF3 Design
Schedule: The route to CLIC and objectives of the brainstorming session (moderator: J.P. Delahaye)The various possible phases of the Test Facility (moderator: I. Wilson)Constraints from the LPI: schedule-building-components (moderator: J.P. Potier)The injector system based on thermoionic gun (modera...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/372938 |
_version_ | 1780893186891186176 |
---|---|
author | Guemara, H |
author_facet | Guemara, H |
author_sort | Guemara, H |
collection | CERN |
description | Schedule: The route to CLIC and objectives of the brainstorming session (moderator: J.P. Delahaye)The various possible phases of the Test Facility (moderator: I. Wilson)Constraints from the LPI: schedule-building-components (moderator: J.P. Potier)The injector system based on thermoionic gun (moderator: L. Rinolfi)Possible option of photo-injector (moderators: G. Suberlucq - S. Hutchins)Trade off between energy and current in CTF3 (moderator: R. Corsini)The RF power source of the drive beam accelerator (moderator: P. Pearce)RF pulse compression for the drive beam accelerator (moderator: Y. Syratchev)The drive beam accelerator (moderator: L. Thorndahl)Beam dynamics in drive beam accelerator (moderators: G. Guignard - D. Schulte)The combiner ring and delay loop (moderator: R. Corsini)The 30 GHz modules of the drive beam decelerator and main beam accelerator (moderator: W. Wuensch)Possible tests in CTF2 in preparation for CTF3 (moderator: H. Braun) Conclusion programme of work (moderator: J.P. Delahaye) |
id | cern-372938 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1998 |
publisher | CERN |
record_format | invenio |
spelling | cern-3729382023-08-17T09:44:35Zhttp://cds.cern.ch/record/372938engGuemara, HAway-Day: a Review of the Preparation of the CTF3 DesignAccelerators and Storage RingsSchedule: The route to CLIC and objectives of the brainstorming session (moderator: J.P. Delahaye)The various possible phases of the Test Facility (moderator: I. Wilson)Constraints from the LPI: schedule-building-components (moderator: J.P. Potier)The injector system based on thermoionic gun (moderator: L. Rinolfi)Possible option of photo-injector (moderators: G. Suberlucq - S. Hutchins)Trade off between energy and current in CTF3 (moderator: R. Corsini)The RF power source of the drive beam accelerator (moderator: P. Pearce)RF pulse compression for the drive beam accelerator (moderator: Y. Syratchev)The drive beam accelerator (moderator: L. Thorndahl)Beam dynamics in drive beam accelerator (moderators: G. Guignard - D. Schulte)The combiner ring and delay loop (moderator: R. Corsini)The 30 GHz modules of the drive beam decelerator and main beam accelerator (moderator: W. Wuensch)Possible tests in CTF2 in preparation for CTF3 (moderator: H. Braun) Conclusion programme of work (moderator: J.P. Delahaye)CERNCERN-OPEN-98-034CLIC-Note-383oai:cds.cern.ch:3729381998 |
spellingShingle | Accelerators and Storage Rings Guemara, H Away-Day: a Review of the Preparation of the CTF3 Design |
title | Away-Day: a Review of the Preparation of the CTF3 Design |
title_full | Away-Day: a Review of the Preparation of the CTF3 Design |
title_fullStr | Away-Day: a Review of the Preparation of the CTF3 Design |
title_full_unstemmed | Away-Day: a Review of the Preparation of the CTF3 Design |
title_short | Away-Day: a Review of the Preparation of the CTF3 Design |
title_sort | away-day: a review of the preparation of the ctf3 design |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/372938 |
work_keys_str_mv | AT guemarah awaydayareviewofthepreparationofthectf3design |