Cargando…
Away-Day: a Review of the Preparation of the CTF3 Design
Schedule: The route to CLIC and objectives of the brainstorming session (moderator: J.P. Delahaye)The various possible phases of the Test Facility (moderator: I. Wilson)Constraints from the LPI: schedule-building-components (moderator: J.P. Potier)The injector system based on thermoionic gun (modera...
Autor principal: | Guemara, H |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/372938 |
Ejemplares similares
-
CTF II Away Days on 11th and 12th March 1996
por: Braun, H H
Publicado: (1996) -
Possible tests in CTF2 in preparation for CTF3
por: Braun, H
Publicado: (1998) -
Two days for a two - beam accelerator in the CTF (CTF2)
por: Madsen, J H B, et al.
Publicado: (1994) -
Away-Day
por: Delahaye, J P
Publicado: (1998) -
CTF3 Design Report
por: Geschonke, Günther, et al.
Publicado: (2002)