The antiproton decelerator: overview

The Antiproton Decelerator (AD) is a simplified scheme for the provision of antiprotons at 100 MeV/c based on fast extraction. It uses the existing antiproton production target area and the modified Antiproton Collector Ring in their current locations. The machine modifications necessary to deliver...

Descripción completa

Detalles Bibliográficos
Autores principales: Hémery, J Y, Maury, S
Lenguaje:eng
Publicado: 1998
Materias:
Acceso en línea:https://dx.doi.org/10.1016/S0375-9474(99)00223-7
http://cds.cern.ch/record/373142
_version_ 1780893196841123840
author Hémery, J Y
Maury, S
author_facet Hémery, J Y
Maury, S
author_sort Hémery, J Y
collection CERN
description The Antiproton Decelerator (AD) is a simplified scheme for the provision of antiprotons at 100 MeV/c based on fast extraction. It uses the existing antiproton production target area and the modified Antiproton Collector Ring in their current locations. The machine modifications necessary to deliver batches of 1 x 10$^7$ antiproton/mn at 100 MeV/c are well under way. Commissioning with test-protons is foreseen to start this September (1998), running-in with antiprotons is planned to start after the shut down (December 1998 - April 1999) in Spring 1999. First physics runs are planned for late Summer/Autumn 1999. The status of the machine is described.
id cern-373142
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1998
record_format invenio
spelling cern-3731422021-11-11T09:55:28Zdoi:10.1016/S0375-9474(99)00223-7http://cds.cern.ch/record/373142engHémery, J YMaury, SThe antiproton decelerator: overviewAccelerators and Storage RingsThe Antiproton Decelerator (AD) is a simplified scheme for the provision of antiprotons at 100 MeV/c based on fast extraction. It uses the existing antiproton production target area and the modified Antiproton Collector Ring in their current locations. The machine modifications necessary to deliver batches of 1 x 10$^7$ antiproton/mn at 100 MeV/c are well under way. Commissioning with test-protons is foreseen to start this September (1998), running-in with antiprotons is planned to start after the shut down (December 1998 - April 1999) in Spring 1999. First physics runs are planned for late Summer/Autumn 1999. The status of the machine is described.CERN-PS-98-062-HPoai:cds.cern.ch:3731421998-12-01
spellingShingle Accelerators and Storage Rings
Hémery, J Y
Maury, S
The antiproton decelerator: overview
title The antiproton decelerator: overview
title_full The antiproton decelerator: overview
title_fullStr The antiproton decelerator: overview
title_full_unstemmed The antiproton decelerator: overview
title_short The antiproton decelerator: overview
title_sort antiproton decelerator: overview
topic Accelerators and Storage Rings
url https://dx.doi.org/10.1016/S0375-9474(99)00223-7
http://cds.cern.ch/record/373142
work_keys_str_mv AT hemeryjy theantiprotondeceleratoroverview
AT maurys theantiprotondeceleratoroverview
AT hemeryjy antiprotondeceleratoroverview
AT maurys antiprotondeceleratoroverview