Cargando…
Control and interlock system for the SPS main power converters
The control and interlock system of the main power converters was 20 years old and needed to be replaced. In order to face the shrinking resources of CERN, it was decided to adopt, as far as possible, standard industrial solutions and to contract out the development of the new system to industry. A...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/377082 |
_version_ | 1780893286371688448 |
---|---|
author | Denis, B Malacarne, Philippe Mugnier, C Varas, J |
author_facet | Denis, B Malacarne, Philippe Mugnier, C Varas, J |
author_sort | Denis, B |
collection | CERN |
description | The control and interlock system of the main power converters was 20 years old and needed to be replaced. In order to face the shrinking resources of CERN, it was decided to adopt, as far as possible, standard industrial solutions and to contract out the development of the new system to industry. A tender was sent to European firms and the contract was awarded to GTD, a Spanish Engineering Firm, in May 1997. The SPS accelerator restarted in March 98 with the new Control and Interlock System. |
id | cern-377082 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1998 |
record_format | invenio |
spelling | cern-3770822023-05-05T13:07:32Zhttp://cds.cern.ch/record/377082engDenis, BMalacarne, PhilippeMugnier, CVaras, JControl and interlock system for the SPS main power convertersAccelerators and Storage RingsThe control and interlock system of the main power converters was 20 years old and needed to be replaced. In order to face the shrinking resources of CERN, it was decided to adopt, as far as possible, standard industrial solutions and to contract out the development of the new system to industry. A tender was sent to European firms and the contract was awarded to GTD, a Spanish Engineering Firm, in May 1997. The SPS accelerator restarted in March 98 with the new Control and Interlock System.CERN-SL-98-077-POoai:cds.cern.ch:3770821998-12-01 |
spellingShingle | Accelerators and Storage Rings Denis, B Malacarne, Philippe Mugnier, C Varas, J Control and interlock system for the SPS main power converters |
title | Control and interlock system for the SPS main power converters |
title_full | Control and interlock system for the SPS main power converters |
title_fullStr | Control and interlock system for the SPS main power converters |
title_full_unstemmed | Control and interlock system for the SPS main power converters |
title_short | Control and interlock system for the SPS main power converters |
title_sort | control and interlock system for the sps main power converters |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/377082 |
work_keys_str_mv | AT denisb controlandinterlocksystemforthespsmainpowerconverters AT malacarnephilippe controlandinterlocksystemforthespsmainpowerconverters AT mugnierc controlandinterlocksystemforthespsmainpowerconverters AT varasj controlandinterlocksystemforthespsmainpowerconverters |