Cargando…
Proposal for a "Dummy Load" Configuration for Testing Converters for Superconducting Magnets
The Large Hadron Collider (LHC) is CERNs next particle accelerator project, scheduled forcommissioning in 2005. The project requires DC-converters to supply the superconductingmagnets. While the converters are being developed, actual superconducting magnets with veryhigh-time constant are not avail...
Autor principal: | Campiche, P |
---|---|
Lenguaje: | eng |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/377331 |
Ejemplares similares
-
Configuration Management System for the LHC Superconducting Magnet Test Benches
por: Ladzinski, T, et al.
Publicado: (2003) -
Protection of Hardware: Powering Systems (Power Converter, Normal Conducting, and Superconducting Magnets)
por: Pfeffer, H., et al.
Publicado: (2016) -
Possible Cryogenic Configurations for the Superconducting Magnets of the Damping Rings of the Compact Linear Collider (CLIC)
por: Perin, A, et al.
Publicado: (2012) -
Manufacturing and Testing of Accelerator Superconducting Magnets
por: Rossi, L
Publicado: (2015) -
Tests of the superconducting bending magnets 'CESAR'
por: Pérot, J, et al.
Publicado: (1979)