Cargando…
Status of the Nominal Proton Beam for LHC in the PS
The RF systems which are necessary for the generation of the nominal proton beam for the LHC in the PS Complex have been installed in the PSB and in the PS during the shutdown 97-98. This has permitted the complete set of longitudinal operations required by this beam to be tested and adjusted. The h...
Autor principal: | Garoby, R |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/382971 |
Ejemplares similares
-
Status of the nominal proton beam for LHC in the PS
por: Garoby, R
Publicado: (1999) -
LHC proton beams in the PS Complex: status and plans
por: Garoby, R
Publicado: (2004) -
The PS complex produces the nominal LHC beam
por: Benedikt, M, et al.
Publicado: (2000) -
PS for LHC nominal proton beam: studies, results, further plans
por: Cappi, R
Publicado: (2001) -
The PS complex produces the nominal LHC beam
por: Benedikt, Michael, et al.
Publicado: (2000)