The AD Vacuum System: Construction and Commissioning

CERN has built a new experimental facility, called the Antiproton Decelerator (AD), by transforming two existing machines: the "Antiproton Collector" (AC) and the "Antiproton Accumulator" (AA). To achieve adequate beam performance once the antiproton beam is decelerated to its fi...

Descripción completa

Detalles Bibliográficos
Autores principales: Brouet, M, Hansen, J, Klette, H, Strubin, Pierre M
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/387146
_version_ 1780893605693489152
author Brouet, M
Hansen, J
Klette, H
Strubin, Pierre M
author_facet Brouet, M
Hansen, J
Klette, H
Strubin, Pierre M
author_sort Brouet, M
collection CERN
description CERN has built a new experimental facility, called the Antiproton Decelerator (AD), by transforming two existing machines: the "Antiproton Collector" (AC) and the "Antiproton Accumulator" (AA). To achieve adequate beam performance once the antiproton beam is decelerated to its final value of 0.1 GeV/c, it was necessary to lower the average pressure by nearly two orders of magnitude. For this purpose, a large number of additional pumps were installed and a very careful preparation was applied to a variety of special machine equipment which, in its original construction, was not designed for ultra-high vacuum operation. An important improvement in the outgassing rates was achieved through an extended, mild bake-out of tanks and vacuum vessels containing large amounts of ferrite material and multi-layer thermal insulation. This paper describes the necessary modifications of the vacuum system and in more detail the various steps taken to obtain the required pressure in the low 10-10 mbar range. It will also report on the unexpected difficulties which were encountered by re-using vacuum components that were not initially designed for bake-out.
id cern-387146
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-3871462023-05-31T14:19:16Zhttp://cds.cern.ch/record/387146engBrouet, MHansen, JKlette, HStrubin, Pierre MThe AD Vacuum System: Construction and CommissioningAccelerators and Storage RingsCERN has built a new experimental facility, called the Antiproton Decelerator (AD), by transforming two existing machines: the "Antiproton Collector" (AC) and the "Antiproton Accumulator" (AA). To achieve adequate beam performance once the antiproton beam is decelerated to its final value of 0.1 GeV/c, it was necessary to lower the average pressure by nearly two orders of magnitude. For this purpose, a large number of additional pumps were installed and a very careful preparation was applied to a variety of special machine equipment which, in its original construction, was not designed for ultra-high vacuum operation. An important improvement in the outgassing rates was achieved through an extended, mild bake-out of tanks and vacuum vessels containing large amounts of ferrite material and multi-layer thermal insulation. This paper describes the necessary modifications of the vacuum system and in more detail the various steps taken to obtain the required pressure in the low 10-10 mbar range. It will also report on the unexpected difficulties which were encountered by re-using vacuum components that were not initially designed for bake-out.CERN-LHC-99-004-VACoai:cds.cern.ch:3871461999-04-23
spellingShingle Accelerators and Storage Rings
Brouet, M
Hansen, J
Klette, H
Strubin, Pierre M
The AD Vacuum System: Construction and Commissioning
title The AD Vacuum System: Construction and Commissioning
title_full The AD Vacuum System: Construction and Commissioning
title_fullStr The AD Vacuum System: Construction and Commissioning
title_full_unstemmed The AD Vacuum System: Construction and Commissioning
title_short The AD Vacuum System: Construction and Commissioning
title_sort ad vacuum system: construction and commissioning
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/387146
work_keys_str_mv AT brouetm theadvacuumsystemconstructionandcommissioning
AT hansenj theadvacuumsystemconstructionandcommissioning
AT kletteh theadvacuumsystemconstructionandcommissioning
AT strubinpierrem theadvacuumsystemconstructionandcommissioning
AT brouetm advacuumsystemconstructionandcommissioning
AT hansenj advacuumsystemconstructionandcommissioning
AT kletteh advacuumsystemconstructionandcommissioning
AT strubinpierrem advacuumsystemconstructionandcommissioning