Cargando…

High Energy Operation of LEP2

The LEP collider was operated during 1998 for the first time at a beam energy of 94.5 GeV. The 272 superconducting (sc) cavities were operated at an average gradient of more than 6MV/m. The high current in short bunches caused severe higher order mode heating of components. Nevertheless the machine...

Descripción completa

Detalles Bibliográficos
Autor principal: Myers, S
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/387148
_version_ 1780893606119211008
author Myers, S
author_facet Myers, S
author_sort Myers, S
collection CERN
description The LEP collider was operated during 1998 for the first time at a beam energy of 94.5 GeV. The 272 superconducting (sc) cavities were operated at an average gradient of more than 6MV/m. The high current in short bunches caused severe higher order mode heating of components. Nevertheless the machine proved very reliable with excellent performance. The maximum integrated luminosity over a 24 hour period exceeded 3.5pb-1 and the vertical beam-beam shift parameter reached more than .075 in three of the interaction regions with a record of .08 in the fourth. The present and future performance and limitations of the machine are reviewed as well as some of the crucial technical systems. During 1999 attempts will be made to increase the beam energy to around 100GeV with the help of an additional 16 sc cavities and by operating at gradients around 7MV/m.
id cern-387148
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-3871482023-05-05T13:07:34Zhttp://cds.cern.ch/record/387148engMyers, SHigh Energy Operation of LEP2Accelerators and Storage RingsThe LEP collider was operated during 1998 for the first time at a beam energy of 94.5 GeV. The 272 superconducting (sc) cavities were operated at an average gradient of more than 6MV/m. The high current in short bunches caused severe higher order mode heating of components. Nevertheless the machine proved very reliable with excellent performance. The maximum integrated luminosity over a 24 hour period exceeded 3.5pb-1 and the vertical beam-beam shift parameter reached more than .075 in three of the interaction regions with a record of .08 in the fourth. The present and future performance and limitations of the machine are reviewed as well as some of the crucial technical systems. During 1999 attempts will be made to increase the beam energy to around 100GeV with the help of an additional 16 sc cavities and by operating at gradients around 7MV/m.CERN-SL-99-012-DIoai:cds.cern.ch:3871481999
spellingShingle Accelerators and Storage Rings
Myers, S
High Energy Operation of LEP2
title High Energy Operation of LEP2
title_full High Energy Operation of LEP2
title_fullStr High Energy Operation of LEP2
title_full_unstemmed High Energy Operation of LEP2
title_short High Energy Operation of LEP2
title_sort high energy operation of lep2
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/387148
work_keys_str_mv AT myerss highenergyoperationoflep2