LHC Beam Instrumentation
Six years before the scheduled commissioning of the LHC at CERN, the basic list of beam instruments has been established. This early date is needed due to the impact of the mechanical design of some detectors (mainly the beam position detectors) on the cryogenic part of the machine as well as for ot...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/387150 |
_version_ | 1780893606561710080 |
---|---|
author | Bosser, Jacques Bovet, Claude Fischer, C Jung, R Koziol, Heribert Schmickler, Hermann Vos, L |
author_facet | Bosser, Jacques Bovet, Claude Fischer, C Jung, R Koziol, Heribert Schmickler, Hermann Vos, L |
author_sort | Bosser, Jacques |
collection | CERN |
description | Six years before the scheduled commissioning of the LHC at CERN, the basic list of beam instruments has been established. This early date is needed due to the impact of the mechanical design of some detectors (mainly the beam position detectors) on the cryogenic part of the machine as well as for other projects due to the long R&D period (emittance measurements, tune and chromaticity diagnostics and control). This paper gives a detailed overview of the basic requirements and specifications of all beam instruments foreseen for transfer lines and main rings [1]. |
id | cern-387150 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1999 |
record_format | invenio |
spelling | cern-3871502023-05-05T13:07:35Zhttp://cds.cern.ch/record/387150engBosser, JacquesBovet, ClaudeFischer, CJung, RKoziol, HeribertSchmickler, HermannVos, LLHC Beam InstrumentationAccelerators and Storage RingsSix years before the scheduled commissioning of the LHC at CERN, the basic list of beam instruments has been established. This early date is needed due to the impact of the mechanical design of some detectors (mainly the beam position detectors) on the cryogenic part of the machine as well as for other projects due to the long R&D period (emittance measurements, tune and chromaticity diagnostics and control). This paper gives a detailed overview of the basic requirements and specifications of all beam instruments foreseen for transfer lines and main rings [1].CERN-SL-99-015-BIoai:cds.cern.ch:3871501999 |
spellingShingle | Accelerators and Storage Rings Bosser, Jacques Bovet, Claude Fischer, C Jung, R Koziol, Heribert Schmickler, Hermann Vos, L LHC Beam Instrumentation |
title | LHC Beam Instrumentation |
title_full | LHC Beam Instrumentation |
title_fullStr | LHC Beam Instrumentation |
title_full_unstemmed | LHC Beam Instrumentation |
title_short | LHC Beam Instrumentation |
title_sort | lhc beam instrumentation |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/387150 |
work_keys_str_mv | AT bosserjacques lhcbeaminstrumentation AT bovetclaude lhcbeaminstrumentation AT fischerc lhcbeaminstrumentation AT jungr lhcbeaminstrumentation AT koziolheribert lhcbeaminstrumentation AT schmicklerhermann lhcbeaminstrumentation AT vosl lhcbeaminstrumentation |