Overview of LEP operation in 1998
After the installation of 32 additional RF cavities in the 1997-1998 shutdown LEP was operated at a beam energy of 94.5 GeV. The total integrated luminosity for the year 1998 clearly surpassed its target and reached 198 pb-1. Vertical beam-beam tuneshiftsof more than 0.07 were obtained. The performa...
Autores principales: | , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/387151 |
_version_ | 1780893606790299648 |
---|---|
author | Arduini, Gianluigi Assmann, R W Bailey, R Burkhardt, H Butterworth, A Collier, Paul Cornelis, Karel Faugier, A Jonker, M Lamont, M Meddahi, Malika Morpurgo, G Raimondi, Pantaleo Roy, G Uythoven, J Wenninger, J |
author_facet | Arduini, Gianluigi Assmann, R W Bailey, R Burkhardt, H Butterworth, A Collier, Paul Cornelis, Karel Faugier, A Jonker, M Lamont, M Meddahi, Malika Morpurgo, G Raimondi, Pantaleo Roy, G Uythoven, J Wenninger, J |
author_sort | Arduini, Gianluigi |
collection | CERN |
description | After the installation of 32 additional RF cavities in the 1997-1998 shutdown LEP was operated at a beam energy of 94.5 GeV. The total integrated luminosity for the year 1998 clearly surpassed its target and reached 198 pb-1. Vertical beam-beam tuneshiftsof more than 0.07 were obtained. The performance did not seem to be beam-beam limited, but the total beam current was limited by power dissipation problems to around 6 mA. A high phase advance optics (102o, 90o), with a smaller natural emittance, was used for regular operation in 1998. This contributed to the excellent performance of LEP, together with the further reduction of both the horizontal and vertical beta function at the interaction points. No dynamic aperture problems were encountered. |
id | cern-387151 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1999 |
record_format | invenio |
spelling | cern-3871512023-05-05T13:07:35Zhttp://cds.cern.ch/record/387151engArduini, GianluigiAssmann, R WBailey, RBurkhardt, HButterworth, ACollier, PaulCornelis, KarelFaugier, AJonker, MLamont, MMeddahi, MalikaMorpurgo, GRaimondi, PantaleoRoy, GUythoven, JWenninger, JOverview of LEP operation in 1998Accelerators and Storage RingsAfter the installation of 32 additional RF cavities in the 1997-1998 shutdown LEP was operated at a beam energy of 94.5 GeV. The total integrated luminosity for the year 1998 clearly surpassed its target and reached 198 pb-1. Vertical beam-beam tuneshiftsof more than 0.07 were obtained. The performance did not seem to be beam-beam limited, but the total beam current was limited by power dissipation problems to around 6 mA. A high phase advance optics (102o, 90o), with a smaller natural emittance, was used for regular operation in 1998. This contributed to the excellent performance of LEP, together with the further reduction of both the horizontal and vertical beta function at the interaction points. No dynamic aperture problems were encountered.CERN-SL-99-017-BToai:cds.cern.ch:3871511999 |
spellingShingle | Accelerators and Storage Rings Arduini, Gianluigi Assmann, R W Bailey, R Burkhardt, H Butterworth, A Collier, Paul Cornelis, Karel Faugier, A Jonker, M Lamont, M Meddahi, Malika Morpurgo, G Raimondi, Pantaleo Roy, G Uythoven, J Wenninger, J Overview of LEP operation in 1998 |
title | Overview of LEP operation in 1998 |
title_full | Overview of LEP operation in 1998 |
title_fullStr | Overview of LEP operation in 1998 |
title_full_unstemmed | Overview of LEP operation in 1998 |
title_short | Overview of LEP operation in 1998 |
title_sort | overview of lep operation in 1998 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/387151 |
work_keys_str_mv | AT arduinigianluigi overviewoflepoperationin1998 AT assmannrw overviewoflepoperationin1998 AT baileyr overviewoflepoperationin1998 AT burkhardth overviewoflepoperationin1998 AT butterwortha overviewoflepoperationin1998 AT collierpaul overviewoflepoperationin1998 AT corneliskarel overviewoflepoperationin1998 AT faugiera overviewoflepoperationin1998 AT jonkerm overviewoflepoperationin1998 AT lamontm overviewoflepoperationin1998 AT meddahimalika overviewoflepoperationin1998 AT morpurgog overviewoflepoperationin1998 AT raimondipantaleo overviewoflepoperationin1998 AT royg overviewoflepoperationin1998 AT uythovenj overviewoflepoperationin1998 AT wenningerj overviewoflepoperationin1998 |