Cargando…

Technical Developments on Reduced $\beta$ Superconducting Cavities at CERN

Several authors proposed the construction of superconducting proton linacs using the LEP2 cavities once LEP will be decommissioned. However only a fraction (about half) of these cavities can be used as they are for the high-energy part (b~1) of such a linac, the low energy part requiring the develop...

Descripción completa

Detalles Bibliográficos
Autores principales: Aberle, O, Boussard, Daniel, Calatroni, Sergio, Chiaveri, Enrico, Häbel, E, Hanni, R, Losito, R, Marque, S, Tückmantel, Joachim
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/387156
_version_ 1780893607871381504
author Aberle, O
Boussard, Daniel
Calatroni, Sergio
Chiaveri, Enrico
Häbel, E
Hanni, R
Losito, R
Marque, S
Tückmantel, Joachim
author_facet Aberle, O
Boussard, Daniel
Calatroni, Sergio
Chiaveri, Enrico
Häbel, E
Hanni, R
Losito, R
Marque, S
Tückmantel, Joachim
author_sort Aberle, O
collection CERN
description Several authors proposed the construction of superconducting proton linacs using the LEP2 cavities once LEP will be decommissioned. However only a fraction (about half) of these cavities can be used as they are for the high-energy part (b~1) of such a linac, the low energy part requiring the development of accelerating structures optimized for lower values of the particle velocity. At CERN an R&D programme on reduced-b single-cell cavities started in 1996 in order to study and explore the limits of the technology successfully used for the production of LEP2 cavities (copper cavities niobium-plated using the magnetron sputtering technique). Four different geometries were extensively investigated, each representing part of a multicell structure optimized for particles having b=0.48, b=0.625, b=0.66 and b=0.8 respectively. The results were encouraging for the last two types and therefore a new phase of R&D aimed at the production of multicell cavities for b=0.66 and b=0.8 was started. The goal is to demonstrate simultaneously the feasibility of such cavities and the possibility of producing them by low-cost modification of LEP cavities.
id cern-387156
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-3871562023-05-05T13:07:36Zhttp://cds.cern.ch/record/387156engAberle, OBoussard, DanielCalatroni, SergioChiaveri, EnricoHäbel, EHanni, RLosito, RMarque, STückmantel, JoachimTechnical Developments on Reduced $\beta$ Superconducting Cavities at CERNAccelerators and Storage RingsSeveral authors proposed the construction of superconducting proton linacs using the LEP2 cavities once LEP will be decommissioned. However only a fraction (about half) of these cavities can be used as they are for the high-energy part (b~1) of such a linac, the low energy part requiring the development of accelerating structures optimized for lower values of the particle velocity. At CERN an R&D programme on reduced-b single-cell cavities started in 1996 in order to study and explore the limits of the technology successfully used for the production of LEP2 cavities (copper cavities niobium-plated using the magnetron sputtering technique). Four different geometries were extensively investigated, each representing part of a multicell structure optimized for particles having b=0.48, b=0.625, b=0.66 and b=0.8 respectively. The results were encouraging for the last two types and therefore a new phase of R&D aimed at the production of multicell cavities for b=0.66 and b=0.8 was started. The goal is to demonstrate simultaneously the feasibility of such cavities and the possibility of producing them by low-cost modification of LEP cavities.CERN-SL-99-024-CToai:cds.cern.ch:3871561999
spellingShingle Accelerators and Storage Rings
Aberle, O
Boussard, Daniel
Calatroni, Sergio
Chiaveri, Enrico
Häbel, E
Hanni, R
Losito, R
Marque, S
Tückmantel, Joachim
Technical Developments on Reduced $\beta$ Superconducting Cavities at CERN
title Technical Developments on Reduced $\beta$ Superconducting Cavities at CERN
title_full Technical Developments on Reduced $\beta$ Superconducting Cavities at CERN
title_fullStr Technical Developments on Reduced $\beta$ Superconducting Cavities at CERN
title_full_unstemmed Technical Developments on Reduced $\beta$ Superconducting Cavities at CERN
title_short Technical Developments on Reduced $\beta$ Superconducting Cavities at CERN
title_sort technical developments on reduced $\beta$ superconducting cavities at cern
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/387156
work_keys_str_mv AT aberleo technicaldevelopmentsonreducedbetasuperconductingcavitiesatcern
AT boussarddaniel technicaldevelopmentsonreducedbetasuperconductingcavitiesatcern
AT calatronisergio technicaldevelopmentsonreducedbetasuperconductingcavitiesatcern
AT chiaverienrico technicaldevelopmentsonreducedbetasuperconductingcavitiesatcern
AT habele technicaldevelopmentsonreducedbetasuperconductingcavitiesatcern
AT hannir technicaldevelopmentsonreducedbetasuperconductingcavitiesatcern
AT lositor technicaldevelopmentsonreducedbetasuperconductingcavitiesatcern
AT marques technicaldevelopmentsonreducedbetasuperconductingcavitiesatcern
AT tuckmanteljoachim technicaldevelopmentsonreducedbetasuperconductingcavitiesatcern