Cargando…
Quality Assurance Plan for the AL3 Test Procedure
This paper describes the new quality assurance plan for the Alarms-of-Level-3 (AL3) test. The aim of the plan is to introduce engineering techniques and to standardise and simplify the procedures for carrying out tests following Safety Instruction 37 (IS37). The procedures are to co-ordinate all the...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/388512 |
_version_ | 1780893640397160448 |
---|---|
author | Béjar-Alonso, Isabel |
author_facet | Béjar-Alonso, Isabel |
author_sort | Béjar-Alonso, Isabel |
collection | CERN |
description | This paper describes the new quality assurance plan for the Alarms-of-Level-3 (AL3) test. The aim of the plan is to introduce engineering techniques and to standardise and simplify the procedures for carrying out tests following Safety Instruction 37 (IS37). The procedures are to co-ordinate all the services involved (fire brigade, maintenance and computer support) and to create a consistent documentation. When the procedures are implemented, it will be possible to determine with confidence how field actions are carried out and to measure actual performance. The focus will be on personnel training and documentation. It is important however to keep documentation and procedures to a reasonable level that can be maintained at appropriate intervals. The plan is the result of an internal requirement from ST/MC and a formal request from Installations Nucléaires de Base (INB). |
id | cern-388512 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1999 |
record_format | invenio |
spelling | cern-3885122019-09-30T06:29:59Zhttp://cds.cern.ch/record/388512engBéjar-Alonso, IsabelQuality Assurance Plan for the AL3 Test ProcedureEngineeringThis paper describes the new quality assurance plan for the Alarms-of-Level-3 (AL3) test. The aim of the plan is to introduce engineering techniques and to standardise and simplify the procedures for carrying out tests following Safety Instruction 37 (IS37). The procedures are to co-ordinate all the services involved (fire brigade, maintenance and computer support) and to create a consistent documentation. When the procedures are implemented, it will be possible to determine with confidence how field actions are carried out and to measure actual performance. The focus will be on personnel training and documentation. It is important however to keep documentation and procedures to a reasonable level that can be maintained at appropriate intervals. The plan is the result of an internal requirement from ST/MC and a formal request from Installations Nucléaires de Base (INB).CERN-ST-99-036oai:cds.cern.ch:3885121999-02-02 |
spellingShingle | Engineering Béjar-Alonso, Isabel Quality Assurance Plan for the AL3 Test Procedure |
title | Quality Assurance Plan for the AL3 Test Procedure |
title_full | Quality Assurance Plan for the AL3 Test Procedure |
title_fullStr | Quality Assurance Plan for the AL3 Test Procedure |
title_full_unstemmed | Quality Assurance Plan for the AL3 Test Procedure |
title_short | Quality Assurance Plan for the AL3 Test Procedure |
title_sort | quality assurance plan for the al3 test procedure |
topic | Engineering |
url | http://cds.cern.ch/record/388512 |
work_keys_str_mv | AT bejaralonsoisabel qualityassuranceplanfortheal3testprocedure |