Quality Assurance Plan for the AL3 Test Procedure

This paper describes the new quality assurance plan for the Alarms-of-Level-3 (AL3) test. The aim of the plan is to introduce engineering techniques and to standardise and simplify the procedures for carrying out tests following Safety Instruction 37 (IS37). The procedures are to co-ordinate all the...

Descripción completa

Detalles Bibliográficos
Autor principal: Béjar-Alonso, Isabel
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/388512
_version_ 1780893640397160448
author Béjar-Alonso, Isabel
author_facet Béjar-Alonso, Isabel
author_sort Béjar-Alonso, Isabel
collection CERN
description This paper describes the new quality assurance plan for the Alarms-of-Level-3 (AL3) test. The aim of the plan is to introduce engineering techniques and to standardise and simplify the procedures for carrying out tests following Safety Instruction 37 (IS37). The procedures are to co-ordinate all the services involved (fire brigade, maintenance and computer support) and to create a consistent documentation. When the procedures are implemented, it will be possible to determine with confidence how field actions are carried out and to measure actual performance. The focus will be on personnel training and documentation. It is important however to keep documentation and procedures to a reasonable level that can be maintained at appropriate intervals. The plan is the result of an internal requirement from ST/MC and a formal request from Installations Nucléaires de Base (INB).
id cern-388512
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-3885122019-09-30T06:29:59Zhttp://cds.cern.ch/record/388512engBéjar-Alonso, IsabelQuality Assurance Plan for the AL3 Test ProcedureEngineeringThis paper describes the new quality assurance plan for the Alarms-of-Level-3 (AL3) test. The aim of the plan is to introduce engineering techniques and to standardise and simplify the procedures for carrying out tests following Safety Instruction 37 (IS37). The procedures are to co-ordinate all the services involved (fire brigade, maintenance and computer support) and to create a consistent documentation. When the procedures are implemented, it will be possible to determine with confidence how field actions are carried out and to measure actual performance. The focus will be on personnel training and documentation. It is important however to keep documentation and procedures to a reasonable level that can be maintained at appropriate intervals. The plan is the result of an internal requirement from ST/MC and a formal request from Installations Nucléaires de Base (INB).CERN-ST-99-036oai:cds.cern.ch:3885121999-02-02
spellingShingle Engineering
Béjar-Alonso, Isabel
Quality Assurance Plan for the AL3 Test Procedure
title Quality Assurance Plan for the AL3 Test Procedure
title_full Quality Assurance Plan for the AL3 Test Procedure
title_fullStr Quality Assurance Plan for the AL3 Test Procedure
title_full_unstemmed Quality Assurance Plan for the AL3 Test Procedure
title_short Quality Assurance Plan for the AL3 Test Procedure
title_sort quality assurance plan for the al3 test procedure
topic Engineering
url http://cds.cern.ch/record/388512
work_keys_str_mv AT bejaralonsoisabel qualityassuranceplanfortheal3testprocedure