Cargando…
Contract Management of LHC Civil Engineering at Point 5
Civil engineering work commenced in August 1998 at LEP Point 5 for the underground and surface works necessary to accommodate the CMS detector for the LHC project. The principal underground works consist of two parallel caverns, separated by a support pillar, two new shafts, a number of smaller conn...
Autor principal: | Osborne, J A |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/388516 |
Ejemplares similares
-
Organization and management of the LHC civil-engineering contracts
por: Watson, T
Publicado: (1999) -
The Use of Value Engineering Techniques in the LHC Civil Engineering Contracts
por: Watson, T
Publicado: (2000) -
The construction of the LHC: civil engineering highlights
por: Baldy, Jean-Luc, et al.
Publicado: (2009) -
Claims in civil engineering contracts
por: Speirs, N A
Publicado: (1999) -
LHC Civil Engineering Construction Contracts: Cost Monitoring and Budget Forecasting
por: Skelton, K
Publicado: (2000)