Cargando…
The production of dense lead-ion beams for the CERN LHC
To reach the design luminosity for lead-ions in the LHC, the present Low Energy Antiproton Ring (LEAR) has to be converted into a Low Energy Ion Ring (LEIR). Since the present ECR lead-ion source does not provide sufficient intensity, the main goal of LEIR is to act as a low-energy (4.2MeV/u) accumu...
Autores principales: | Bosser, Jacques, Carli, Christian, Chanel, M, MacCaferri, R, Molinari, G, Maury, S, Möhl, D, Tranquille, G |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1016/S0168-9002(99)01120-1 http://cds.cern.ch/record/390617 |
Ejemplares similares
-
The production of dense lead-ion beams for the CERN LHC
por: Bosser, J, et al.
Publicado: (1999) -
Results on lead ion accumulation in LEAR for the LHC
por: Bosser, Jacques, et al.
Publicado: (1998) -
Electron cooling of PB$^{54+}$ ions in the low energy ion ring (LEIR)
por: Bosser, Jacques, et al.
Publicado: (1998) -
Ion cooling and accumulation
por: Bosser, Jacques, et al.
Publicado: (1998) -
Experimental investigation of electron cooling and stacking of lead ions in a low energy accumulation ring
por: Bosser, Jacques, et al.
Publicado: (1999)