Cargando…
Study for a failsafe trigger generation system for the Large Hadron Collider beam dump kicker magnets
The 27 km-particle accelerator Large Hadron Collider (LHC), which will be completed at the European Laboratory for Particle Physics (CERN) in 2005, will work with extremely high beam energies (~334 MJ per beam). Since the equipment and in particular the superconducting magnets must be protected from...
Autor principal: | Rampl, M |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/394750 |
Ejemplares similares
-
Steel Tape-wound Cut Cores as Magnet Yokes for the Beam Dump Kickers of the Large Hadron Collider
por: Mayer, M, et al.
Publicado: (2004) -
Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider
por: Magnin, Nicolas, et al.
Publicado: (2015) -
A high power pulse generator for the beam dumping kicker system of CERN's large electron positron collider LEP
por: Carlier, E, et al.
Publicado: (1993) -
Wideband Precision Current Transformer for the Magnet Current of the Beam Extraction Kicker Magnet of the Large Hadron Collider
por: Gräwer, G, et al.
Publicado: (2004) -
Kickers and dumps
por: Mertens, V
Publicado: (2011)