Cargando…
Construction, Commissioning and Operational Experience of the Advanced Photon Source (APS) Linear Accelerator
Autores principales: | White, M, Arnold, N, Berg, W, Cours, A, Fuja, R, Grelick, A E, Ko, K, Qian, Y L, Russell, T, Sereno, N S, Wesolowski, W |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
1996
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-1996-007.315 http://cds.cern.ch/record/399820 |
Ejemplares similares
-
RF and Beam Diagnostic Instrumentation at the Advanced Photon Source (APS) Linear Accelerator (Linac)
por: Grelick, A E, et al.
Publicado: (1996) -
APS Linac Klystron and Accelerating Waveguide Gain Measurements and Klystron PFN Voltage
por: Sereno, N S
Publicado: (1997) -
Commissioning measurements for photon beam data on three TrueBeam linear accelerators, and comparison with Trilogy and Clinac 2100 linear accelerators
por: Beyer, Gloria P.
Publicado: (2013) -
352-MHz Klystron Performance at the Advanced Photon Source
por: Horan, D, et al.
Publicado: (1999) -
Commissioning an Elekta Versa HD linear accelerator
por: Narayanasamy, Ganesh, et al.
Publicado: (2016)