Cargando…
Operational Experience with the CEBAF Control System
Autores principales: | Hovater, C, Chowdhary, M, Karn, J, Tiefenback, M G, Van Zeijts, J, Watson, W |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
1996
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-1996-007.616 http://cds.cern.ch/record/400074 |
Ejemplares similares
-
On-Line Measurement and Tuning of Multi-Pass Recirculation Time in the CEBAF Linacs
por: Tiefenback, M G
Publicado: (2001) -
The CEBAF RF Separator System
por: Hovater, C, et al.
Publicado: (1996) -
Microphonics Testing of the CEBAF Upgrade 7-Cell Cavity
por: Davis, G K, et al.
Publicado: (2001) -
The CEBAF instrumentation and control system
por: Rossmanith, R
Publicado: (1990) -
Modification of the CEBAF Transport Dipoles for Energy Upgrade Considerations
por: Bullard, D, et al.
Publicado: (1999)