Cargando…
Arrival of the Proportional Chambers (PC's) in the CPLEAR experimental area
Picture made during the winter shutdown of 91-92.
Autor principal: | M. Droege |
---|---|
Lenguaje: | ENG |
Publicado: |
1991
|
Acceso en línea: | http://cds.cern.ch/record/40021 |
Ejemplares similares
-
Arrival of the Drift Chambers in the CPLEAR experimental area
por: M Droege
Publicado: (1991) -
Installation of the Drift Chambers (DC's) in the CPLEAR detector
por: M Droege
Publicado: (1991) -
View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done
por: M Droege
Publicado: (1991) -
View of the CPLEAR detector after installation of the Drift Chambers: the electronic cabling has still to be done
por: M Droege
Publicado: (1991) -
Installation of the end-caps of the CPLEAR detector
por: M. Droege
Publicado: (1991)