Cargando…

Test of a 30 GHz Planar Accelerating Structure in the CLIC Test Facility II

A prototype of a 30 GHz planar accelerating structure has been manufactured by Heino Henke, Rolf Merte (Technical University of Berlin, DE) and David Yu (DULY Research, US). The structure has been brazed at CERN (CH) and it has been tested in the CLIC Test Facility II (CTF II) at CERN. The structure...

Descripción completa

Detalles Bibliográficos
Autores principales: Braun, H, Valentini, M, Wuensch, Walter
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/400896
_version_ 1780894165590081536
author Braun, H
Valentini, M
Wuensch, Walter
author_facet Braun, H
Valentini, M
Wuensch, Walter
author_sort Braun, H
collection CERN
description A prototype of a 30 GHz planar accelerating structure has been manufactured by Heino Henke, Rolf Merte (Technical University of Berlin, DE) and David Yu (DULY Research, US). The structure has been brazed at CERN (CH) and it has been tested in the CLIC Test Facility II (CTF II) at CERN. The structure was installed in the probe beam accelerator, in place of one of the CLIC accelerating structures, in the first module of the 30 GHz test accelerator and it has been powered with a CLIC Power Extraction and Transfer Structure (PETS). The following tests have been performed: 1. measurement of the RF pulse produced by the beam-loading of a single bunch, 2. injection of high power (80-40 MW) at 30 GHz in different pulse lengths (4-16 ns), 3. measurement of the accelerating gradient by means of a single bunch probe beam.
id cern-400896
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-4008962023-07-20T15:06:04Zhttp://cds.cern.ch/record/400896engBraun, HValentini, MWuensch, WalterTest of a 30 GHz Planar Accelerating Structure in the CLIC Test Facility IIAccelerators and Storage RingsA prototype of a 30 GHz planar accelerating structure has been manufactured by Heino Henke, Rolf Merte (Technical University of Berlin, DE) and David Yu (DULY Research, US). The structure has been brazed at CERN (CH) and it has been tested in the CLIC Test Facility II (CTF II) at CERN. The structure was installed in the probe beam accelerator, in place of one of the CLIC accelerating structures, in the first module of the 30 GHz test accelerator and it has been powered with a CLIC Power Extraction and Transfer Structure (PETS). The following tests have been performed: 1. measurement of the RF pulse produced by the beam-loading of a single bunch, 2. injection of high power (80-40 MW) at 30 GHz in different pulse lengths (4-16 ns), 3. measurement of the accelerating gradient by means of a single bunch probe beam.CERN-OPEN-99-233CLIC-Note-413oai:cds.cern.ch:4008961999-09-15
spellingShingle Accelerators and Storage Rings
Braun, H
Valentini, M
Wuensch, Walter
Test of a 30 GHz Planar Accelerating Structure in the CLIC Test Facility II
title Test of a 30 GHz Planar Accelerating Structure in the CLIC Test Facility II
title_full Test of a 30 GHz Planar Accelerating Structure in the CLIC Test Facility II
title_fullStr Test of a 30 GHz Planar Accelerating Structure in the CLIC Test Facility II
title_full_unstemmed Test of a 30 GHz Planar Accelerating Structure in the CLIC Test Facility II
title_short Test of a 30 GHz Planar Accelerating Structure in the CLIC Test Facility II
title_sort test of a 30 ghz planar accelerating structure in the clic test facility ii
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/400896
work_keys_str_mv AT braunh testofa30ghzplanaracceleratingstructureintheclictestfacilityii
AT valentinim testofa30ghzplanaracceleratingstructureintheclictestfacilityii
AT wuenschwalter testofa30ghzplanaracceleratingstructureintheclictestfacilityii