Cargando…
Separated antiproton beam in the South Hall of the PS
View looking upstream : the 10-m long separator tank is seen in the upper/left part.
Autor principal: | |
---|---|
Publicado: |
1962
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/40114 |
Sumario: | View looking upstream : the 10-m long separator tank is seen in the upper/left part. |
---|