Cargando…
The Central Beam and Cycle Management of the CERN Accelerator Complex
The efficient exploitation of the CERN accelerator complex in the future, with new cycles to fill the LHC and possibly a dedicated neutrino cycle in addition to the actual fixed-target program, will require a rapid and coordinated response to adapt to the changing user requests. This paper reviews t...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/404160 |
_version_ | 1780894293815197696 |
---|---|
author | Bau, J C Jonker, M Lewis, J |
author_facet | Bau, J C Jonker, M Lewis, J |
author_sort | Bau, J C |
collection | CERN |
description | The efficient exploitation of the CERN accelerator complex in the future, with new cycles to fill the LHC and possibly a dedicated neutrino cycle in addition to the actual fixed-target program, will require a rapid and coordinated response to adapt to the changing user requests. This paper reviews the general sequencing problem and describes some preliminary concepts and algorithms suitable for managing a network of accelerators. The benefits derived from the architecture that has already been implemented in the PS complex, since its start up in March, are presented. The last accelerator in the injector chain, the SPS, is currently running fixed super-cycles. Its event-based timing system will be integrated into the central control by the year 2001 in a way that is transparent to the SPS equipment. |
id | cern-404160 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1999 |
record_format | invenio |
spelling | cern-4041602023-05-05T13:07:43Zhttp://cds.cern.ch/record/404160engBau, J CJonker, MLewis, JThe Central Beam and Cycle Management of the CERN Accelerator ComplexAccelerators and Storage RingsThe efficient exploitation of the CERN accelerator complex in the future, with new cycles to fill the LHC and possibly a dedicated neutrino cycle in addition to the actual fixed-target program, will require a rapid and coordinated response to adapt to the changing user requests. This paper reviews the general sequencing problem and describes some preliminary concepts and algorithms suitable for managing a network of accelerators. The benefits derived from the architecture that has already been implemented in the PS complex, since its start up in March, are presented. The last accelerator in the injector chain, the SPS, is currently running fixed super-cycles. Its event-based timing system will be integrated into the central control by the year 2001 in a way that is transparent to the SPS equipment.CERN-PS-99-054-COCERN-SL-99-064-COoai:cds.cern.ch:4041601999-10-18 |
spellingShingle | Accelerators and Storage Rings Bau, J C Jonker, M Lewis, J The Central Beam and Cycle Management of the CERN Accelerator Complex |
title | The Central Beam and Cycle Management of the CERN Accelerator Complex |
title_full | The Central Beam and Cycle Management of the CERN Accelerator Complex |
title_fullStr | The Central Beam and Cycle Management of the CERN Accelerator Complex |
title_full_unstemmed | The Central Beam and Cycle Management of the CERN Accelerator Complex |
title_short | The Central Beam and Cycle Management of the CERN Accelerator Complex |
title_sort | central beam and cycle management of the cern accelerator complex |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/404160 |
work_keys_str_mv | AT baujc thecentralbeamandcyclemanagementofthecernacceleratorcomplex AT jonkerm thecentralbeamandcyclemanagementofthecernacceleratorcomplex AT lewisj thecentralbeamandcyclemanagementofthecernacceleratorcomplex AT baujc centralbeamandcyclemanagementofthecernacceleratorcomplex AT jonkerm centralbeamandcyclemanagementofthecernacceleratorcomplex AT lewisj centralbeamandcyclemanagementofthecernacceleratorcomplex |