Cargando…

On-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERN

The future Large Hadron Collider to be built at CERN will use superconducting magnets cooled down to 1.2 K. To preserve the superconductivity, the energy deposition dose levels in equipment located outside the cryostat, in the LHC tunnel, are calculated to be of the order of 1 to 10 Gy per year. At...

Descripción completa

Detalles Bibliográficos
Autores principales: Rausch, R, Tavlet, Marc
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/404863
_version_ 1780894321798545408
author Rausch, R
Tavlet, Marc
author_facet Rausch, R
Tavlet, Marc
author_sort Rausch, R
collection CERN
description The future Large Hadron Collider to be built at CERN will use superconducting magnets cooled down to 1.2 K. To preserve the superconductivity, the energy deposition dose levels in equipment located outside the cryostat, in the LHC tunnel, are calculated to be of the order of 1 to 10 Gy per year. At such dose levels, no major radiation-damage problems are to be expected, and the possibility of installing Commercial Of The Shelf (COTS) electronic equipment in the LHC tunnel along the accelerator is considered. To this purpose, industrial electronic equipment and circuits have to be qualified and tested against radiation to insure their long term stability and reliability. An on-line radiation test facility has been setup at the CERN Super Proton Synchrotron (SPS) and a program of on-line tests for electronic equipment is ongoing. Equipment tested includes Industrial Programmable Logic Controllers (PLCs) from several manufacturers, standard VME modules, Fieldbuses like Profibus, WorldFIP and CAN, various electronic cards, power converter equipment and cryogenic components. The irradiation is taking place in one of the target areas of the CERN SPS. The radiation is typical of a proton accelerator, it includes mainly gammas and neutrons, plus some some high-energy particles.
id cern-404863
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-4048632023-05-05T13:07:44Zhttp://cds.cern.ch/record/404863engRausch, RTavlet, MarcOn-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERNHealth Physics and Radiation EffectsThe future Large Hadron Collider to be built at CERN will use superconducting magnets cooled down to 1.2 K. To preserve the superconductivity, the energy deposition dose levels in equipment located outside the cryostat, in the LHC tunnel, are calculated to be of the order of 1 to 10 Gy per year. At such dose levels, no major radiation-damage problems are to be expected, and the possibility of installing Commercial Of The Shelf (COTS) electronic equipment in the LHC tunnel along the accelerator is considered. To this purpose, industrial electronic equipment and circuits have to be qualified and tested against radiation to insure their long term stability and reliability. An on-line radiation test facility has been setup at the CERN Super Proton Synchrotron (SPS) and a program of on-line tests for electronic equipment is ongoing. Equipment tested includes Industrial Programmable Logic Controllers (PLCs) from several manufacturers, standard VME modules, Fieldbuses like Profibus, WorldFIP and CAN, various electronic cards, power converter equipment and cryogenic components. The irradiation is taking place in one of the target areas of the CERN SPS. The radiation is typical of a proton accelerator, it includes mainly gammas and neutrons, plus some some high-energy particles.CERN-SL-99-065-COCERN-TIS-99-09-TE-IRoai:cds.cern.ch:4048631999-10-25
spellingShingle Health Physics and Radiation Effects
Rausch, R
Tavlet, Marc
On-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERN
title On-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERN
title_full On-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERN
title_fullStr On-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERN
title_full_unstemmed On-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERN
title_short On-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERN
title_sort on-line radiation test facility for industrial equipment needed for the large hadron collider at cern
topic Health Physics and Radiation Effects
url http://cds.cern.ch/record/404863
work_keys_str_mv AT rauschr onlineradiationtestfacilityforindustrialequipmentneededforthelargehadroncollideratcern
AT tavletmarc onlineradiationtestfacilityforindustrialequipmentneededforthelargehadroncollideratcern