Cargando…

On-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERN

The future Large Hadron Collider to be built at CERN will use superconducting magnets cooled down to 1.2 K. To preserve the superconductivity, the energy deposition dose levels in equipment located outside the cryostat, in the LHC tunnel, are calculated to be of the order of 1 to 10 Gy per year. At...

Descripción completa

Detalles Bibliográficos
Autores principales: Rausch, R, Tavlet, Marc
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/404863