Cargando…

A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1

In this report we describe the proposed beam separation and collision schemes for interaction points 1 and 5 in the LHC for optics version 6. The original proposal for optics version 5 was redesigned to be compatible with new requirements and the existing hardware. Contrary to the original scheme, i...

Descripción completa

Detalles Bibliográficos
Autores principales: Brüning, Oliver Sim, Herr, Werner, Ostojic, R
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/407317
_version_ 1780894423960256512
author Brüning, Oliver Sim
Herr, Werner
Ostojic, R
author_facet Brüning, Oliver Sim
Herr, Werner
Ostojic, R
author_sort Brüning, Oliver Sim
collection CERN
description In this report we describe the proposed beam separation and collision schemes for interaction points 1 and 5 in the LHC for optics version 6. The original proposal for optics version 5 was redesigned to be compatible with new requirements and the existing hardware. Contrary to the original scheme, in our scenario some magnets in the common part of the two rings are used to establish part of the crossing angle. However, individual control of the two beams remains fully possible. The necessary corrector strengths are significantly smaller and the aperture requirements less severe. Furthermore, this new scheme would allow to further increase the crossing angle, if required.
id cern-407317
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-4073172023-05-31T13:20:33Zhttp://cds.cern.ch/record/407317engBrüning, Oliver SimHerr, WernerOstojic, RA Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1Accelerators and Storage RingsIn this report we describe the proposed beam separation and collision schemes for interaction points 1 and 5 in the LHC for optics version 6. The original proposal for optics version 5 was redesigned to be compatible with new requirements and the existing hardware. Contrary to the original scheme, in our scenario some magnets in the common part of the two rings are used to establish part of the crossing angle. However, individual control of the two beams remains fully possible. The necessary corrector strengths are significantly smaller and the aperture requirements less severe. Furthermore, this new scheme would allow to further increase the crossing angle, if required.LHC-Project-Report-315CERN-LHC-Project-Report-315oai:cds.cern.ch:4073171999-11-10
spellingShingle Accelerators and Storage Rings
Brüning, Oliver Sim
Herr, Werner
Ostojic, R
A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1
title A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1
title_full A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1
title_fullStr A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1
title_full_unstemmed A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1
title_short A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1
title_sort beam separation and collision scheme for ip1 and ip5 at the lhc for optics version 6.1
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/407317
work_keys_str_mv AT bruningoliversim abeamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61
AT herrwerner abeamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61
AT ostojicr abeamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61
AT bruningoliversim beamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61
AT herrwerner beamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61
AT ostojicr beamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61