Cargando…
A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1
In this report we describe the proposed beam separation and collision schemes for interaction points 1 and 5 in the LHC for optics version 6. The original proposal for optics version 5 was redesigned to be compatible with new requirements and the existing hardware. Contrary to the original scheme, i...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/407317 |
_version_ | 1780894423960256512 |
---|---|
author | Brüning, Oliver Sim Herr, Werner Ostojic, R |
author_facet | Brüning, Oliver Sim Herr, Werner Ostojic, R |
author_sort | Brüning, Oliver Sim |
collection | CERN |
description | In this report we describe the proposed beam separation and collision schemes for interaction points 1 and 5 in the LHC for optics version 6. The original proposal for optics version 5 was redesigned to be compatible with new requirements and the existing hardware. Contrary to the original scheme, in our scenario some magnets in the common part of the two rings are used to establish part of the crossing angle. However, individual control of the two beams remains fully possible. The necessary corrector strengths are significantly smaller and the aperture requirements less severe. Furthermore, this new scheme would allow to further increase the crossing angle, if required. |
id | cern-407317 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1999 |
record_format | invenio |
spelling | cern-4073172023-05-31T13:20:33Zhttp://cds.cern.ch/record/407317engBrüning, Oliver SimHerr, WernerOstojic, RA Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1Accelerators and Storage RingsIn this report we describe the proposed beam separation and collision schemes for interaction points 1 and 5 in the LHC for optics version 6. The original proposal for optics version 5 was redesigned to be compatible with new requirements and the existing hardware. Contrary to the original scheme, in our scenario some magnets in the common part of the two rings are used to establish part of the crossing angle. However, individual control of the two beams remains fully possible. The necessary corrector strengths are significantly smaller and the aperture requirements less severe. Furthermore, this new scheme would allow to further increase the crossing angle, if required.LHC-Project-Report-315CERN-LHC-Project-Report-315oai:cds.cern.ch:4073171999-11-10 |
spellingShingle | Accelerators and Storage Rings Brüning, Oliver Sim Herr, Werner Ostojic, R A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1 |
title | A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1 |
title_full | A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1 |
title_fullStr | A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1 |
title_full_unstemmed | A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1 |
title_short | A Beam Separation and Collision Scheme for IP1 and IP5 at the LHC for Optics Version 6.1 |
title_sort | beam separation and collision scheme for ip1 and ip5 at the lhc for optics version 6.1 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/407317 |
work_keys_str_mv | AT bruningoliversim abeamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61 AT herrwerner abeamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61 AT ostojicr abeamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61 AT bruningoliversim beamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61 AT herrwerner beamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61 AT ostojicr beamseparationandcollisionschemeforip1andip5atthelhcforopticsversion61 |