Cargando…
The use of production management techniques in the construction of large scale physics detectors
The construction process of detectors for the Large Hadron Collider (LHC) experiments is large scale, heavily constrained by resource availability and evolves with time. As a consequence, changes in detector component design need to be tracked and quickly reflected in the construction process. With...
Autores principales: | Bazan, A, Chevenier, G, Estrella, F, Kovács, Z, Le Flour, T, Le Goff, J M, Lieunard, S, McClatchey, R, Murray, S, Varga, L Z, Vialle, J P, Zsenei, M |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/23.775550 http://cds.cern.ch/record/409264 |
Ejemplares similares
-
Detector Construction Management and Quality Control: Establishing and Using a CRISTAL System
por: Le Goff, J.M., et al.
Publicado: (1998) -
From Design to Production Control Through the Integration of Engineering Data Management and Workflow Management Systems
por: Le Goff, J M, et al.
Publicado: (1997) -
Design patterns for description-driven systems
por: Bazan, A, et al.
Publicado: (2000) -
Workflow management in the assembly of CMS ECAL
por: Baker, N, et al.
Publicado: (1998) -
C.R.I.S.T.A.L. Concurrent Repository & Information System for Tracking Assembly and production Lifecycles: A data capture and production management tool for the assembly and construction of the CMS ECAL detector
por: Le Goff, J-M., et al.
Publicado: (2001)