Cargando…
130/18 kV sub-station
The new 130/18 kV sub-station came into operation in September 1965.
Autor principal: | CERN PhotoLab |
---|---|
Publicado: |
1965
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/40985 |
Ejemplares similares
-
Pit PP1 : gyroscopic station on a monument fo the determination of azimuths in the underground works
por: CERN PhotoLab
Publicado: (1973) -
Major Refit for CERN's 400 kV Substation (Part of the new control and protection system for the 18 kV side)
Publicado: (2001) -
Aerial view of CERN Prevessin Site with 400 kV sub-station
por: Jean-Luc Caron
Publicado: (1996) -
800 MeV booster
por: CERN PhotoLab
Publicado: (1969) -
Work on piping in one of the tunnels linking various buildings at CERN
por: CERN PhotoLab
Publicado: (1965)