The AD vacuum system: construction and commissioning
CERN has built a new experimental facility, called the Antiproton Decelerator (AD), by transforming two existing machines: the "Antiproton Collector" (AC) and the "Antiproton Accumulator" (AA). To achieve adequate beam performance once the antiproton beam is decelerated to its fi...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/410773 |
_version_ | 1780894584650334208 |
---|---|
author | Brouet, M Hansen, J Klette, H Strubin, Pierre M |
author_facet | Brouet, M Hansen, J Klette, H Strubin, Pierre M |
author_sort | Brouet, M |
collection | CERN |
description | CERN has built a new experimental facility, called the Antiproton Decelerator (AD), by transforming two existing machines: the "Antiproton Collector" (AC) and the "Antiproton Accumulator" (AA). To achieve adequate beam performance once the antiproton beam is decelerated to its final value of 0.1 GeV/c, it was necessary to lower the average pressure by nearly two orders of magnitude. For this purpose, a large number of additional pumps were installed and a very careful preparation was applied to a variety of special machine equipment which, in its original construction, was not designed for ultra-high vacuum operation. An important improvement in the outgassing rates was achieved through an extended, mild bake-out of tanks and vacuum vessels containing large amounts of ferrite material and multi-layer thermal insulation. This paper describes the necessary modifications of the vacuum system and in more detail the various steps taken to obtain the required pressure in the low 10/sup -10/ mbar range. It will also report on the unexpected difficulties which were encountered by re-using vacuum components that were not initially designed for bake-out. (2 refs). |
id | cern-410773 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1999 |
record_format | invenio |
spelling | cern-4107732019-09-30T06:29:59Zhttp://cds.cern.ch/record/410773engBrouet, MHansen, JKlette, HStrubin, Pierre MThe AD vacuum system: construction and commissioningEngineeringCERN has built a new experimental facility, called the Antiproton Decelerator (AD), by transforming two existing machines: the "Antiproton Collector" (AC) and the "Antiproton Accumulator" (AA). To achieve adequate beam performance once the antiproton beam is decelerated to its final value of 0.1 GeV/c, it was necessary to lower the average pressure by nearly two orders of magnitude. For this purpose, a large number of additional pumps were installed and a very careful preparation was applied to a variety of special machine equipment which, in its original construction, was not designed for ultra-high vacuum operation. An important improvement in the outgassing rates was achieved through an extended, mild bake-out of tanks and vacuum vessels containing large amounts of ferrite material and multi-layer thermal insulation. This paper describes the necessary modifications of the vacuum system and in more detail the various steps taken to obtain the required pressure in the low 10/sup -10/ mbar range. It will also report on the unexpected difficulties which were encountered by re-using vacuum components that were not initially designed for bake-out. (2 refs).oai:cds.cern.ch:4107731999 |
spellingShingle | Engineering Brouet, M Hansen, J Klette, H Strubin, Pierre M The AD vacuum system: construction and commissioning |
title | The AD vacuum system: construction and commissioning |
title_full | The AD vacuum system: construction and commissioning |
title_fullStr | The AD vacuum system: construction and commissioning |
title_full_unstemmed | The AD vacuum system: construction and commissioning |
title_short | The AD vacuum system: construction and commissioning |
title_sort | ad vacuum system: construction and commissioning |
topic | Engineering |
url | http://cds.cern.ch/record/410773 |
work_keys_str_mv | AT brouetm theadvacuumsystemconstructionandcommissioning AT hansenj theadvacuumsystemconstructionandcommissioning AT kletteh theadvacuumsystemconstructionandcommissioning AT strubinpierrem theadvacuumsystemconstructionandcommissioning AT brouetm advacuumsystemconstructionandcommissioning AT hansenj advacuumsystemconstructionandcommissioning AT kletteh advacuumsystemconstructionandcommissioning AT strubinpierrem advacuumsystemconstructionandcommissioning |